Abstract
An extensive application of project network analysis in construction project management has been observed in the last few decades. The scheduling of construction projects is generally carried out using the conventional project scheduling methodologies such as Critical Path Method (CPM), Precedence Diagramming Method (PDM), Programme Evaluation and Review Technique (PERT), and so on. However, construction processes are highly repetitive in functionality. This characteristic makes construction projects more robust and stochastic, and thus requires a neoteric scheduling method rather than the conventional project scheduling techniques thereof. Consequently, an intriguing stochastic project network technique known as Graphical Evaluation and Review Technique (GERT), which is generally used in the industrial scheduling, is proposed to overcome the shortcomings of conventional construction scheduling. The nature of GERT includes probabilistic branching, feedback looping, multiple sink nodes, and multiple node realizations which cannot be achieved in the conventional construction scheduling methodologies. These remarkable features permit the construction personnel to model and analyse projects and systems of a very repetitive nature and high complexities. GERT is the solution with paragon to many real-life projects that face problems like probabilistic occurrences of events, false-starts, activity repetition and multiple outcomes. This research tries to provide a comprehensive implication of GERT for a real-time construction project.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Pritsker, A. A. B., & Happ, W. W. (1966). GERT: graphical evaluation and review technique: Part I, fundamentals. Journal of Industrial Engineering, 17(6), 267–274.
Philip, A. M., & Ramesh Kannan, M. (2021). Constructability assessment of cast in–situ, precast and modular reinforced concrete structures. Materials Today: Proceedings, 45(7), 6011–6015.
Bonham, T. W., Clayton, E. R., & Moore, L. J. (1975). A GERT model to meet future organizational manpower need. Personnel Journal, 54(7), 402–406.
Anderson, P. F., & Taylor III, B. W. (1977). Marketing/quality control interface: The GERT approach. Industrial Marketing Management, 6(6), 420–428.
Moore, L. J., & Taylor III, B. W. (1977). Multiteam, multiproject research and development Planning with GERT. Management Science, 24(4), 401–410.
Taylor, B. W. (1978). Project management using GERT analysis. Project Management Quarterly, 9(3), 15–20.
Yu, L., & Zuo, M. (2008). An estimating method for IT project expected duration oriented to GERT. In L. D. Xu, A. M. Tjoa, & S. S. Chaudhry (Eds.), Research and practical issues of enterprise information systems II. IFIP International Federation for Information Processing (Vol. 255). Boston: Springer.
Wyrozębski, P., & Wyrozębska, A. (2013). Challenges of project planning in the probabilistic approach using PERT, GERT and Monte Carlo. Journal of Management and Marketing, 1(1), 1–8.
Ramani, T., & Kannan, R. (2014). Scheduling of industrialized construction project using graphical evaluation and review technique (GERT). In Proceedings of Second International Conference on Advances in Industrial Engineering Applications (ICAIEA 2014), Anna University, India.
Kannan, R. (2014). Graphical evaluation and review technique (GERT): The panorama in the computation and visualization of network–based project management. In Advances in secure computing, Internet Services, and Applications (pp. 165–179). IGI Global Publisher.
Ghaeli, M., & Sadi-Nezhad, S. (2017). Recent advances on graphical evaluation and review techniques. Journal of Project Management, 2(3), 107–112.
Todorova, M. (2019). GERT model of a technical station for determining the passenger trainset delay. Transport Problems, 14(1), 81–93.
Globa S. B., Maslovsky, V. P., Butakova, N. M., Berezovaya, V. V. (2020). Application of the GERT method to visualize the process of managing receivables and payables of an enterprise. In: R. Silhavy, P. Silhavy, & Z. Prokopova (Eds.), Software engineering perspectives in intelligent systems. CoMeSySo 2020. Advances in Intelligent Systems and Computing (Vol. 1294). Springer.
Dorrer, M., Dorrer, A., & Zyryanov, A. (2021). Numerical modeling of business processes using the apparatus of GERT networks. In: A. G. Kravets, A. A. Bolshakov, & M. Shcherbakov (Eds.), Society 5.0: cyberspace for advanced human-centered society. Studies in Systems, Decision and Control (Vol. 333). Springer.
Pant, J. C. (2001). Project management CPM, PERT, GERT and linear programming (4th ed.). New Delhi: Jain Brothers.
Mubarak, S. A. (2019). Construction project scheduling and control (4th ed., pp. 369). New York: Wiley.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2022 The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Pregina, K., Ramesh Kannan, M. (2022). Stochastic Project Network Scheduling Technique for Construction Projects Using GERT. In: Loon, L.Y., Subramaniyan, M., Gunasekaran, K. (eds) Advances in Construction Management. Lecture Notes in Civil Engineering, vol 191. Springer, Singapore. https://doi.org/10.1007/978-981-16-5839-6_33
Download citation
DOI: https://doi.org/10.1007/978-981-16-5839-6_33
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-16-5838-9
Online ISBN: 978-981-16-5839-6
eBook Packages: EngineeringEngineering (R0)