Skip to main content

Stochastic Project Network Scheduling Technique for Construction Projects Using GERT

  • Conference paper
  • First Online:
Advances in Construction Management

Abstract

An extensive application of project network analysis in construction project management has been observed in the last few decades. The scheduling of construction projects is generally carried out using the conventional project scheduling methodologies such as Critical Path Method (CPM), Precedence Diagramming Method (PDM), Programme Evaluation and Review Technique (PERT), and so on. However, construction processes are highly repetitive in functionality. This characteristic makes construction projects more robust and stochastic, and thus requires a neoteric scheduling method rather than the conventional project scheduling techniques thereof. Consequently, an intriguing stochastic project network technique known as Graphical Evaluation and Review Technique (GERT), which is generally used in the industrial scheduling, is proposed to overcome the shortcomings of conventional construction scheduling. The nature of GERT includes probabilistic branching, feedback looping, multiple sink nodes, and multiple node realizations which cannot be achieved in the conventional construction scheduling methodologies. These remarkable features permit the construction personnel to model and analyse projects and systems of a very repetitive nature and high complexities. GERT is the solution with paragon to many real-life projects that face problems like probabilistic occurrences of events, false-starts, activity repetition and multiple outcomes. This research tries to provide a comprehensive implication of GERT for a real-time construction project.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 299.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 379.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 379.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Pritsker, A. A. B., & Happ, W. W. (1966). GERT: graphical evaluation and review technique: Part I, fundamentals. Journal of Industrial Engineering, 17(6), 267–274.

    Google Scholar 

  2. Philip, A. M., & Ramesh Kannan, M. (2021). Constructability assessment of cast in–situ, precast and modular reinforced concrete structures. Materials Today: Proceedings, 45(7), 6011–6015.

    Google Scholar 

  3. Bonham, T. W., Clayton, E. R., & Moore, L. J. (1975). A GERT model to meet future organizational manpower need. Personnel Journal, 54(7), 402–406.

    Google Scholar 

  4. Anderson, P. F., & Taylor III, B. W. (1977). Marketing/quality control interface: The GERT approach. Industrial Marketing Management, 6(6), 420–428.

    Google Scholar 

  5. Moore, L. J., & Taylor III, B. W. (1977). Multiteam, multiproject research and development Planning with GERT. Management Science, 24(4), 401–410.

    Google Scholar 

  6. Taylor, B. W. (1978). Project management using GERT analysis. Project Management Quarterly, 9(3), 15–20.

    Google Scholar 

  7. Yu, L., & Zuo, M. (2008). An estimating method for IT project expected duration oriented to GERT. In L. D. Xu, A. M. Tjoa, & S. S. Chaudhry (Eds.), Research and practical issues of enterprise information systems II. IFIP International Federation for Information Processing (Vol. 255). Boston: Springer.

    Google Scholar 

  8. Wyrozębski, P., & Wyrozębska, A. (2013). Challenges of project planning in the probabilistic approach using PERT, GERT and Monte Carlo. Journal of Management and Marketing, 1(1), 1–8.

    Google Scholar 

  9. Ramani, T., & Kannan, R. (2014). Scheduling of industrialized construction project using graphical evaluation and review technique (GERT). In Proceedings of Second International Conference on Advances in Industrial Engineering Applications (ICAIEA 2014), Anna University, India.

    Google Scholar 

  10. Kannan, R. (2014). Graphical evaluation and review technique (GERT): The panorama in the computation and visualization of network–based project management. In Advances in secure computing, Internet Services, and Applications (pp. 165–179). IGI Global Publisher.

    Google Scholar 

  11. Ghaeli, M., & Sadi-Nezhad, S. (2017). Recent advances on graphical evaluation and review techniques. Journal of Project Management, 2(3), 107–112.

    Google Scholar 

  12. Todorova, M. (2019). GERT model of a technical station for determining the passenger trainset delay. Transport Problems, 14(1), 81–93.

    Article  Google Scholar 

  13. Globa S. B., Maslovsky, V. P., Butakova, N. M., Berezovaya, V. V. (2020). Application of the GERT method to visualize the process of managing receivables and payables of an enterprise. In: R. Silhavy, P. Silhavy, & Z. Prokopova (Eds.), Software engineering perspectives in intelligent systems. CoMeSySo 2020. Advances in Intelligent Systems and Computing (Vol. 1294). Springer.

    Google Scholar 

  14. Dorrer, M., Dorrer, A., & Zyryanov, A. (2021). Numerical modeling of business processes using the apparatus of GERT networks. In: A. G. Kravets, A. A. Bolshakov, & M. Shcherbakov (Eds.), Society 5.0: cyberspace for advanced human-centered society. Studies in Systems, Decision and Control (Vol. 333). Springer.

    Google Scholar 

  15. Pant, J. C. (2001). Project management CPM, PERT, GERT and linear programming (4th ed.). New Delhi: Jain Brothers.

    Google Scholar 

  16. Mubarak, S. A. (2019). Construction project scheduling and control (4th ed., pp. 369). New York: Wiley.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to M. Ramesh Kannan .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2022 The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Pregina, K., Ramesh Kannan, M. (2022). Stochastic Project Network Scheduling Technique for Construction Projects Using GERT. In: Loon, L.Y., Subramaniyan, M., Gunasekaran, K. (eds) Advances in Construction Management. Lecture Notes in Civil Engineering, vol 191. Springer, Singapore. https://doi.org/10.1007/978-981-16-5839-6_33

Download citation

  • DOI: https://doi.org/10.1007/978-981-16-5839-6_33

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-16-5838-9

  • Online ISBN: 978-981-16-5839-6

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics