Abstract
We study the complexity of motivating time-inconsistent agents to complete long term projects in a graph-based planning model as proposed by Kleinberg and OrenĀ [5]. Given a task graph G with n nodes, our objective is to guide an agent towards a target node t under certain budget constraints. The crux is that the agent may change its strategy over time due to its present-bias. We consider two strategies to guide the agent. First, a single reward is placed at t and arbitrary edges can be removed from G. Secondly, rewards can be placed at arbitrary nodes of G but no edges must be deleted. In both cases we show that it is NP-complete to decide if a given budget is sufficient to guide the agent. For the first setting, we give complementing upper and lower bounds on the approximability of the minimum required budget. In particular, we devise a \((1+\sqrt{n})\)-approximation algorithm and prove NP-hardness for ratios greater than \(\sqrt{n}/3\). Finally, we argue that the second setting does not permit any efficient approximation unless \(\mathrm{P}=\mathrm{NP}\).
S. Albers and D. KraftāWork supported by the European Research Council, Grant Agreement No. 691672.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Akerlof, G.A.: Procrastination and obedience. Am. Econ. Rev. 81, 1ā19 (1991)
Bryan, G., Karlan, D., Nelson, S.: Commitment devices. Ann. Rev. Econ. 2, 671ā698 (2010)
Garey, M.R., Johnson, D.S.: Computers and Intractability: A Guide to the Theory of NP-Completeness. W.H. Freeman and Co., New York (1979)
Gravin, N., Immorlica, N., Lucier, B., Pountourakis, E.: Procrastination with variable present bias. In: 17th ACM Conference on Economics and Computation, pp. 361ā361. ACM, New York (2016)
Kleinberg, J., Oren, S.: Time-inconsistent planning: a computational problem in behavioral economics. In: 15th ACM Conference on Economics and Computation, pp. 547ā564. ACM, New York (2014)
Kleinberg, J., Sigal, O., Manish, R.: Planning problems for sophisticated agents with present bias. In: 17th ACM Conference on Economics and Computation, pp. 343ā360. ACM, New York (2016)
Laibson, D.: Golden eggs and hyperbolic discounting. Q. J. Econ. 112, 443ā477 (1997)
Lynch, J.F.: The equivalence of theorem proving and the interconnection problem. SIGDA Newsl. 5, 31ā36 (1975)
OāDonoghue, T., Rabin, M.: Doing it now or later. Am. Econ. Rev. 89, 103ā124 (1999)
OāDonoghue, T., Rabin, M.: Incentives and self control. In: Advances in Economics and Econometrics: Theory and Application 9th World Congress, vol. 2, pp. 215ā245. Cambridge University Press, Cambridge (2006)
OāDonoghue, T., Rabin, M.: Procrastination on long-term projects. J. Econ. Behav. Organ. 66, 161ā175 (2008)
Tang, P., Teng, Y., Wang, Z., Xiao, S., Xu, Y.: Computational issues in time-inconsistent planning (2015)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
Ā© 2016 Springer-Verlag GmbH Germany
About this paper
Cite this paper
Albers, S., Kraft, D. (2016). Motivating Time-Inconsistent Agents: A Computational Approach. In: Cai, Y., Vetta, A. (eds) Web and Internet Economics. WINE 2016. Lecture Notes in Computer Science(), vol 10123. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-54110-4_22
Download citation
DOI: https://doi.org/10.1007/978-3-662-54110-4_22
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-662-54109-8
Online ISBN: 978-3-662-54110-4
eBook Packages: Computer ScienceComputer Science (R0)