Abstract
For projects consisting of activities which require scarce resources and which are connected by prescribed minimum and maximum time lags, we give a survey of calendar constraints that have to be considered when dealing with real-life applications, e.g. batch production in process industries, building projects, or research projects. Break calendars provide time intervals (breaks) where some resources are not available. Some activities may be interrupted during a break. Others must not be interrupted. Capacity calendars specify the time-varying resource capacity available.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Baxtusch, M., Möhring, R., Radermacher, F.J. (1988): Scheduling project networks with resource constraints and time windows. Ann. Oper. Res. 16, 201–240
Brucker, B., Drexl, A., Möhring, R., Neumann, K., Pesch, E. (1999): Resource-constrained project scheduling: notation, classification, models, and methods. EJOR 112, 3–41
De Reyck, B., Herroelen, W. (1998): A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence constraints. EJOR 111, 152–174
Fest, A., Möhring, R., Stork, F., Uetz, M. (1999): Resource-constrained project scheduling with time windows: a branching scheme based on dynamic release dates. Working Paper 596, Technische Universität Berlin
Franck, B., Neumann, K., Schwindt, C., (2000): Project scheduling with calendars. Submitted to OR Spektrum
Schwindt, C. (1998): Verfahren zur Lösung des ressourcenbeschränkten Projektdauerminimierungsproblems mit planungsabhängigen Zeitfenstern. Shaker, Aachen
Schwindt, C., Trautmann, N. (2000): Batch scheduling in process industries — an application of resource-constrained project scheduling. Accepted for publication in OR Spektrum
Trautmann, N. (1998): Kalendrierung von Projekten mit planungsabhängigen Zeitfenstern und unterbrechbaren Vorgängen. Report WIOR-535, Universität Karlsruhe
Trautmann, N. (2000): Anlagenbelegungsplanung in der Prozeßindustrie. Gabler, Wiesbaden
Zhan, J. (1992): Calendarization of time planning in MPM networks, ZOR — Methods and Models of Operations Research, 423–438
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2001 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Trautmann, N. (2001). Calendars in Project Scheduling. In: Fleischmann, B., Lasch, R., Derigs, U., Domschke, W., Rieder, U. (eds) Operations Research Proceedings. Operations Research Proceedings, vol 2000. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-56656-1_62
Download citation
DOI: https://doi.org/10.1007/978-3-642-56656-1_62
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-41587-9
Online ISBN: 978-3-642-56656-1
eBook Packages: Springer Book Archive