Abstract
Spare part supply for aircraft must be quick and reliable. To reduce costs for spare part supply and aircraft life-cycle costs, broken parts are repaired and put back into stock. Airlines outsource the spare parts provisioning to maintenance, repair, and overhaul providers (MRO) because common spare part pooling saves costs. At their hub, airlines keep one piece of a crucial spare part for immediate replacement of failed parts. Up to now MRO-providers do not take into account the customer-owned stock, when planning their inventory levels. This causes over-stocking at the central warehouse.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Denkena, B., Eikötter, M., Blümel, P., Schneider, R., Khowwigkai, S.: Life Cycle Cost Analysis and Prognosis Model in the Aviation Industry. In: Proceedings of the 5th International Conference on Innovative Production Machines and Systems, pp. 260–265 (2010)
Ghobbar, A., Friend, C.: Evaluation of Forecasting Methods for Intermittent Parts Demand in the Field of Aviation: a Predictive Model. Computers & Operations Research (30), 2097–2114 (2003)
Kilpi, J., Vepsäläinen, A.: Pooling of spare components between airlines (Journal style). Journal of Air Transport Management 10(2), 137 (2004)
Xiancun, N., Hongfu, Z., Ming, L.: Research on Optimization Model of Civil Aircraft Spare Parts Inventory Allocation. In: Proceedings of the Control and Decision Conference, Yantai, China, pp. 1042–1045 (2008)
Kennedy, W.J., Patterson, J.W., Fredenhall, L.D.: An Overview of Recent Literature on Spare Parts Inventories. International Journal on Production Economics (76), 201–215 (2002)
Kumar, U.D., Knezevic, J.: Availability Based Spare Optimization Using Renewal Process. Reliability Engineering and System Safety (59), 217–223 (1998)
Wong, H., van Oudheusden, D., Cattrysse, D.: Cost Allocation in Spare Parts Inventory Pooling. Transportation Research Part E 43, 370–386 (2007)
Jin, T., Tian, Z., Novoa, C.: Managing Performance Based Logistics by Balancing Reliability and Spare Parts Stocking. In: Proceedings of the 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering (ICQRMSE 2011), pp. 440–445 (2011)
Wong, H., Cattryse, D., van Oudheusden, D.: Stocking Decisions for Repairable Spare Parts Pooling in a Multi-Hub System. International Journal of Production Economics (93-94), 309–317 (2005)
Lee, H.L., Moinzadeh, K.: A Repairable Item Inventory System with Diagnostic and Repair Service. European Journal of Operational Research (40), 210–221 (1989)
Guide Jr., V.D.R., Srivastava, R.: Repairable Inventory Theory: Models and Applications. European Journal of Operational Research (102), 1–20 (1997)
Felderhof, J.P.K., Konstantis: A Three Echelon Spare Parts Provisioning Model. European Journal of Operational Research, 118–122 (1986)
Kostic, S., Penlic, Z.: Optimization of Spare Parts in a Multilevel Maintenance System. In: Engineering Costs and Production Economics, pp. 93–99 (1990)
Tracht, K., Mederer, M., Schneider, D.: Effects of Lateral Transshipments in a Multi-Echelon Closed-Loop Supply chain. In: Hesselbach, J., Hermann, C. (eds.) Glocalized Solutions for Sustainability in Manufacturing, pp. 443–447. Springer (2011)
Tracht, K., Mederer, M., Schneider, D.: Source Selection in Spare Part Supply. In: Proceedings of the 44th International Conference on Manufacturing Systems (ICMS 2011), Madison, WI, USA (2011)
Axsäter, S.: Modeling Emergency Transshipments in Inventory Systems. Management Science 36(11), 1329–1338 (1990)
Kutanoglu, E., Mahajan, M.: An Inventory Sharing and Allocation Method for a Multi-Location Service Parts Logistics Network with Time-Based Service Levels. European Journal of Operational Research 194(3), 728–742 (2009)
Paterson, C., Kiesmüller, G., Teunter, R., Glazebrook, K.: Inventory Models with Lateral Transshipments: A review. European Journal of Operational Research (2010) (in press)
Kranenburg, A.A., van Houtum, G.J.: A New Partial Pooling Structure for Spare Parts Networks. European Journal of Operational Research (199), 908–921 (2009)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2012 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Tracht, K., Mederer, M., Schneider, D. (2012). Impact of Parameter Changes in a Service Provider Closed-Loop Supply Chain with Customer-Owned-Stock. In: Dornfeld, D., Linke, B. (eds) Leveraging Technology for a Sustainable World. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-29069-5_100
Download citation
DOI: https://doi.org/10.1007/978-3-642-29069-5_100
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-29068-8
Online ISBN: 978-3-642-29069-5
eBook Packages: EngineeringEngineering (R0)