The construction of roads and power supply lines causes disturbances which differ from forest clearing for farming purposes by several major issues:
-
The disturbance is linear and narrow but extends over a wide distance.
-
Not only is the topsoil affected but usually the entire soil layer is stripped and, especially in a mountainous area, even the slopes are clipped and ablated and broadenings are banked.
-
The forest is usually cleared mechanically and not by the use of fire.
-
Once the traffic route is completed, disturbance continues either by regular cutting of the vegetation along the wayside or by landslides of various dimensions caused by erosion of the steep embankments.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2008 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Beck, E., Hartig, K., Roos, K., Preußig, M., Nebel, M. (2008). Permanent Removal of the Forest: Construction of Roads and Power Supply Lines. In: Beck, E., Bendix, J., Kottke, I., Makeschin, F., Mosandl, R. (eds) Gradients in a Tropical Mountain Ecosystem of Ecuador. Ecological Studies, vol 198. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-73526-7_34
Download citation
DOI: https://doi.org/10.1007/978-3-540-73526-7_34
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-73525-0
Online ISBN: 978-3-540-73526-7
eBook Packages: Biomedical and Life SciencesBiomedical and Life Sciences (R0)