Abstract
Industrial Product-Service-Systems (IPS2) represent highly specific customized products with integrated development of product and service shares. Due to the multiplicity of customized IPS2 that are used parallel the responsible person has to be supported in the planning of the IPS? delivery over the life-cycle.
This support must be two-stage. At first the automated aggregation of the single resources requirements to the best possible total resources requirement is done considering the customer related boundary conditions. Thereupon the total resources requirement is analyzed in detail regarding the intensity of planning of each resource. The intensity of planning in this context specifies how intense the responsible person has to address himself to which resource.
This article describes basic methodic approaches to execute the necessary planning steps that can constitute fundamentals for a computer-aided implementation.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
6 References
Tan. A.R.: McAloone, T.C.: Charateristics of strategies in Product/Service-System Development, International Design Conference — Design 2006, Dubrovnik — Croatia, May 15–18, 2006
Matzen, D.; Tan A.R.; Myrup Andreasen, M.: Product/Service-Systems: Proposal for Models and Terminology, 16. Symposium “Design For X”, Neukirchen, October 13–15, 2005
Tucker, A.; Tischner, U.: New Business for Old Europe — Product-Service Development, Competiveness and Sustainability, Greanleaf Publishing, Sheffield, UK, 2005
Meier, H., Krug, C.M., Strategische Kapazitätsplanung hybrider Leistungsbündel, PPS Management 11, 48–51, 2006
Meier, H., Kortmann, D., Leadership — From Technology to Use, 14th CIRP Conference on Life Cycle Engineering, 159–163, 2007
Corsten, H., Stuhlmann, St., Kapazitätsplanung in Dienstleistungsunternehmungen, in: Bruhn, M., Meffert, H., Handbuch Dienstleistungsmanagement, Gabler, Wiesbaden, S. 177–192, ISBN 3-409-23593-0, 2001
Meier, H.; Krug, Ch., M.; Planning of Resources by Using Transfer functions, 15th CIRP Life Cycle Engineering Conference, Sydney, Australia, 2007
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2008 Springer-Verlag London Limited
About this paper
Cite this paper
Meier, H., Krug, C.M. (2008). System for Planning of Resources in IPS2-Delivery. In: Mitsuishi, M., Ueda, K., Kimura, F. (eds) Manufacturing Systems and Technologies for the New Frontier. Springer, London. https://doi.org/10.1007/978-1-84800-267-8_96
Download citation
DOI: https://doi.org/10.1007/978-1-84800-267-8_96
Publisher Name: Springer, London
Print ISBN: 978-1-84800-266-1
Online ISBN: 978-1-84800-267-8
eBook Packages: EngineeringEngineering (R0)