Skip to main content

Optimizing the Hunter Valley Coal Chain

  • Chapter
  • First Online:
Supply Chain Disruptions

Abstract

Coal remains the most important energy source for power generation, providing 37% of the world’s electricity. As the global population grows, and as living standards improve in the developing world, international demand for energy is increasing at a rapid rate. Coal is still the most abundant, widely distributed, safe, and economical fossil fuel available to meet this escalating energy demand.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Abdekhodaee A, Dunstall S, Ernst AT et al (2004) Integration of stockyard and rail network: a scheduling case study. In: Proceedings of the 5th Asia-Pacific Industrial Engineering and Management Systems Conference, Gold Coast, pp 1–16

    Google Scholar 

  2. Ahmed S, Sahinidis NV (2003) An approximation scheme for stochastic integer programs arising in capacity expansion. Oper Res 51:461–471

    Article  MathSciNet  MATH  Google Scholar 

  3. Australian Coal Association (2010) http://www.australiancoal.com.au. Accessed 22 June 2010

  4. Australian Department of Foreign Affairs and Trade (2010) Trade at a Glance 2009. http://www.dfat.gov.au/publications/taag/index.html. Accessed 22 June 2010

  5. Bermon S, Hood SJ (1999) Capacity optimization planning systems (CAPS). Interfaces 29: 31–50

    Article  Google Scholar 

  6. Birge J (2000) Option methods for incorporating risk into linear capacity planning models. Manuf Serv Oper Res 2: 19–31

    Article  Google Scholar 

  7. Burdett RL, Kozan E (2009) A sequencing approach for creating new train timetables. OR Spectr 32(1):163–193

    Article  MathSciNet  Google Scholar 

  8. Coal Online. http://www.coalonline.org/site/coalonline/content/hom Accessed 21 June 2010

  9. Clement R (2009) MIP models for scheduling the operations for a coal loading facility. In: Proceedings of the 44th Annual Conference of the ORSNZ, Christchurch, 3–4 December, pp 139–148

    Google Scholar 

  10. Conradie DG, Morison LE, Joubert JW (2008) Scheduling at coal handling facilities using simulated annealing. Math Methods Oper Res 68:277–293

    Article  MathSciNet  MATH  Google Scholar 

  11. Dessouky MM, Lu Q, Zhao J et al (2006) An exact solution procedure for determining the optimal dispatching times for complex rail networks. IIE Trans 38:141–152

    Article  Google Scholar 

  12. Dorfman MJ, Medanic J (2004) Scheduling trains on a railway network using a discrete event model of railway traffic. Transp Res B 38(1):81–98

    Article  Google Scholar 

  13. Ernst A, Krishanmoorthy M, Sier D et al (2008) Solving regional infrastructure bottlenecks: rail allocation policies for a coal terminal. Australas J Reg Stud 14(2):117–194

    Google Scholar 

  14. Everett JE (2007) Computer aids for production systems management in iron ore mining. Int J Prod Econ 110:213–223

    Article  Google Scholar 

  15. Huh WT, Roundy RO, Cakanyildirim M (2006) A general strategic capacity planning model under demand uncertainty. Nav Res Logist 53:37–150

    Article  MathSciNet  Google Scholar 

  16. IEA Clean Coal Centre (2010) http://www.iea-coal.org/site/ieacoal/hom Accessed 21 June 2010

  17. Pochet Y, Wolsey LA (2006) Production planning by mixed integer programming. Springer Science + Business Media, Inc. New York

    MATH  Google Scholar 

  18. Pudney P, Wardrop A (2008) Generating train plans with problem space search. Lect Notes Econ Math Syst 600:195–207

    Article  Google Scholar 

  19. Queyranne M, Schulz AS (1994) Polyhedral approaches to machine scheduling, Technical report 408/1994, Department of Mathematics, Technische Universität Berlin, Berlin, Germany

    Google Scholar 

  20. Singh G, Sier D, Ernst AT et al (2009) Long term capacity planning for the Hunter Valley coal chain: models and algorithms. 20th National ASOR Conference, Gold Coast, September 2009, pp 27–29

    Google Scholar 

  21. Steenken D, Voß S, Stahlbock R et al (2004) Container terminal operation and operations research: a classification and literature review. OR Spect 26(1):3–49

    Article  MATH  Google Scholar 

  22. Vandervoort J (2009) At the coal face—ensuring the performance of the Australian coal export supply chain. SMART Conference, Sydney, June 2009, pp 10–11. http://www.hvccc.com.au/HVCCCDocuments/Pages/MiscellaneousPresentations.aspx

  23. Vandervoort J (2009) NSW coal supply chain and logistics. 5th Coaltrans Conference, Brisbane, August 2009, pp 17–18. http://www.hvccc.com.au/HVCCCDocuments/Pages/MiscellaneousPresentations.aspx

  24. Welgama PS, Oyston R (2003) Study of options to increase the throughput of the Hunter Valley coal chain. In: Proceedings of MODSIM 2003, Townsville, July 2003, pp 1841–1846

    Google Scholar 

Download references

Acknowledgment

We express our thanks to the other members of the research team involved in the development of decision technology for the HVCC for their support and valuable comments during the writing of this chapter, i.e., Bhaswar Choudhary, Tracey Giles, and Rob Oyston at HVCCC, Palitha Welgema at Rio Tinto, Andreas Ernst and Gaurav Singh at CSIRO, and Riley Clement, Faramrose Engineer, and Hamish Waterer at the University of Newcastle.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Natashia L. Boland .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2012 Springer-Verlag London Limited

About this chapter

Cite this chapter

Boland, N.L., Savelsbergh, M.W.P. (2012). Optimizing the Hunter Valley Coal Chain. In: Gurnani, H., Mehrotra, A., Ray, S. (eds) Supply Chain Disruptions. Springer, London. https://doi.org/10.1007/978-0-85729-778-5_10

Download citation

  • DOI: https://doi.org/10.1007/978-0-85729-778-5_10

  • Published:

  • Publisher Name: Springer, London

  • Print ISBN: 978-0-85729-777-8

  • Online ISBN: 978-0-85729-778-5

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics