Abstract
The main objective of this research is to develop an automated constructability rating framework for different concrete formwork systems that are commonly used for the construction of reinforced concrete residential buildings. Initially, various constructability criteria (cost, time, quality, safety and environmental sustainability) that are analogous to the concrete formwork construction are rationally characterized through an intriguing data acquisition mechanism (a complete process involving the collection, recording and processing of data) known as constructability survey. Withal, an unified 3D Building Information Modeling (BIM) Model (i.e., 3D Structural BIM Model and 3D BIM Formwork Family or Module) is developed to providence CONSTaFORM, an automated constructability assessment framework for concrete formwork systems. The CONSTaFORM is a supplementary Add-in for Autodesk Revit developed by a process called API-fication, i.e., customizing Revit API to provide additional functionalities and hence enhancing the capabilities of existing framework invariably. The optimal constructability scores of various concrete formwork systems obtained from the constructability survey are initially fed into their respective 3D BIM formwork families as shared parameters, which are later used for the computation of the overall constructability rating of the formwork systems involved in the entire project, using BIM via CONSTaFORM Add-in. To reinforce the profundity and advocacy of CONSTaFORM Add-in, a suitable case study is reported.
Similar content being viewed by others
References
ASCE, The Construction Management Committee (1991). Constructability and constructability programs: White paper. Journal of Construction Engineering and Management, 117(1), 67–89. https://doi.org/10.1061/(ASCE)0733-9364(1991)117:1(67).
Boga, S. R. C., Kansagara, B., & Kannan, R. (2018). Integration of augmented reality and virtual reality in building information modeling: The next frontier in civil engineering education. In Virtual and augmented reality: Concepts, methodologies, tools, and applications (pp. 1037–1066). Hershey, PA: IGI Global. https://doi.org/10.4018/978-1-5225-5469-1.ch049.
Chen, Y., Okudan, G. E., & Riley, D. R. (2010). Sustainable performance criteria for construction method selection in concrete buildings. Automation in Construction, 19(2), 235–244. https://doi.org/10.1016/j.autcon.2009.10.004.
Christian, J., & Mir, S. U. (1987). Use of integrated microcomputer package for formwork design. Journal of Construction Engineering and Management, 113(4), 603–610. https://doi.org/10.1061/(ASCE)0733-9364(1987)113:4(603).
Constructability Industry Institute (1986) Constructability: A primer. Research Summary, RS 3-1, CII, Austin, Texas.
Concrete Reinforcing Steel Institute (1989) Engineering for rapid construction cycles. EDR Number 32, CRSI, Illinois.
Fischer M (1991) Constructability improvement for the preliminary design of reinforced concrete structures, Doctoral Thesis. Department of Civil Engineering, Stanford University, California
Ganah, A. A., Bouchlaghem, N. B., & Anumba C. J. (2005). VISCON: Computer visualisation support for constructability. ITcon. 10:69–83. http://www.itcon.org/papers/2005_7.content.08513.pdf.
Griendling, K. (2016). Visual programming introduction with dynamo and Revit. https://www.pluralsight.com/courses/dynamo-revit-visual-programming-introduction. Accessed on April 15, 2018.
Hanlon, E. J., & Sanvido, V. E. (1995). Constructability information classification scheme. Journal of Construction Engineering and Management, 121(4), 337–345. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:4(337).
Hanna, A. S. (1999). Concrete formwork systems. New York: Marcel Dekker.
Hijaji, W., Alkass, S., & Zayed, T. (2009) Constructability assessment using BIM/4D CAD simulation model. In AACE international transactions. (BIM.04.01-BIM.04.14). https://webserver2.tecgraf.puc-rio.br/ftp_pub/lfm/BIM%20&%20Constructability-Hijazi-Alkass-Zayed.pdf. Accessed on April 15 2018
Hurd, M. K. (2005). Formwork for concrete. SP-4, seventh ed., Michigan: ACI.
Jha, K. N. (2012). Formwork for concrete structures. New Delhi: Tata McGraw-Hill.
Johnson, J. W., & LeBreton, J. M. (2004). History and use of relative important indices in organizational research. Organizational Research Methods, 7(3), 238–257. https://doi.org/10.1177/1094428104266510.
Jun, K.-H., & Yun, S.-H. (2011). The case study of BIM-based quantity take-off for concrete and formwork. Journal of Korean Institute of Building Information Modeling, 1(1), 13–17. (in Korean).
Kannan, M. R., & Knight, G. M. S. (2012). Constructability—the paradigm shift in the construction engineering and management. In Proceedings 2nd international conference on emerging technology trends in advanced engineering research, Baselios Mathews II College of Engineering, Kerala, India. https://doi.org/10.13140/RG.2.1.1685.4562.
Kannan, M. R., & Santhi, M. H. (2013a). Automated construction layout and simulation of concrete formwork systems using building information modeling. In Hardjito, D. and Antoni (eds.) Proceedings 4th international conference of Euro Asia civil engineering forum on innovations in civil engineering for society and the environment, National University of Singapore, Singapore (pp. C7-C14). https://doi.org/10.13140/RG.2.1.4124.6244.
Kannan, M. R., & Santhi, M. H. (2013b). Constructability assessment of climbing formwork systems using building information modeling. Procedia Engineering, 64, 1129–1138. https://doi.org/10.1016/j.proeng.2013.09.191.
Kannan, M. R., & Santhi, M. H. (2015). BIM and concrete formwork: The paradigm shift in formwork industry. The Masterbuilder, 17(9), 74–86. https://www.masterbuilder.co.in/data/edata/Articles/September2015/74.pdf
Kartam, N., & Flood, I. (1997). Constructability feedback systems: Issues and illustrative prototype. Journal of Performance of Constructed Facilities, 11(4), 178–183. https://doi.org/10.1061/(ASCE)0887-3828(1997)11:4(178).
Kim, K., & Cho, Y. (2015). BIM-based planning for temporary structures for construction safety. Computing in Civil Engineering. https://doi.org/10.1061/9780784479247.054.
Kim, T., Lim, H., Cho, H., & Kang, K.-I. (2014). Automated lifting system integrated with construction hoists for table formwork in tall buildings. Journal of Construction Engineering and Management, 140(10), 1–10. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000884.
Lee, C., Ham, S., & Lee, G. (2009). The development of automatic module for formwork layout using the BIM. In Proceeding of international conference on construction management, Jeju, Korea, 3 (pp. 1266–1271). http://big.yonsei.ac.kr/pdf/Publications_Patents/3.%20Conference_Papers(INT'L)/18.%20The%20Development%20of%20Automatic%20Module%20for%20Formwork%20Layout%20using%20the%20BIM.pdf.
Love, P. E. D., Teo, P., Morrison, J., & Grove, M. (2016). Quality and safety in construction: Creating a no-harm environment. Journal of Construction Engineering and Management, 142(8), 1–10. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001133.
McGeorge, D., Zou, P., & Palmer, A. (2012). Construction management: New directions. Hoboken: Wiley.
Meadati, P., Irizarry, J., & Akonukh, A. (2011). BIM and concrete formwork repository. In Proceedings of 47th ASC annual international conference, Associated Schools of Construction. http://ascpro.ascweb.org/chair/paper/CPRT296002011.pdf.
Multimedia Constructability Tool. (1998). Indot constructability tool. Dept. of Civil Engg.: Purdue University, Indiana.
Neto, R. S. N., & Ruschel, R. C. (2015). BIM applied to plywood formwork design in reinforced concrete structures. Built Environment (Ambiente Construido) Porto Alegre, 15(4), 183–201. https://doi.org/10.1590/s1678-86212015000400046. (in Spanish).
O'Connor, J. T., & Davis, V. S. (1988). Constructability improvement during field operations. Journal of Construction Engineering and Management, 114(4), 548–564. https://doi.org/10.1061/(ASCE)0733-9364(1988)114:4(548).
O’Connor, J. T., & Miller, S. J. (1994). Barriers to constructability implementation. Journal of Performance of Constructed Facilities, 8(2), 110–129. https://doi.org/10.1061/(ASCE)0887-3828(1994)8:2(110).
Peurifoy, R. L., & Oberlender, G. D. (2010). Formwork for concrete structures. New York: McGraw-Hill Professional.
Rudder, D. (2013). Instant autodesk Revit 2013 customization with .NET how-to. Birmingham: Packt Publishing.
Somiah, M. K., Osei-Poku, G., & Aidoo, I. (2015). Relative importance analysis of factors influencing unauthorized siting of residential buildings in the Sekondi-Takoradi metropolis of Ghana. Journal of building construction and planning Research, 3(3), 117–126. https://doi.org/10.4236/jbcpr.2015.33012.
Søndergaard, A. (2014). Odico formwork robotics. Architectural Design, 84(3), 66–67. https://doi.org/10.1002/ad.1756.
Tah, J. H. M., & Price, A. D. F. (1997). Computer aided formwork design: A detailed approach. Advances in Engineering Software, 28(7), 437–454. https://doi.org/10.1016/S0965-9978(97)00015-X.
Touran, A. (1988). Concrete formwork: Constructability and difficulties. Civil Engineering Practice, 3(2), 81–88.
Wanberg, J., Harper, C., Hallowell, M. R., & Rajendran, S. (2013). Relationship between construction safety and quality performance. Journal of Construction Engineering and Management, 139(10), 1–10. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000732.
Acknowledgements
The authors would like to thank the following individuals and organizations for their valuable support and guidance in accomplishing this research. Autodesk Education Community, Autodesk, Inc., California, USA for providing free access to the Autodesk Revit 2018 software for our teaching and research. Mr. Amitendra Nath Sarkar (Engineering Manager), Mr. Devendra Dalal (Former Design Engineer), Mrs. Shobana Gajhbiye (Design Engineer), Mr. Sashikanth Deshmukh (Draughtsman), Mr. Suryakanth Kolekar (Draughtsman), Mr. R. Kumar (Senior Formwork Instructor) and Mr. Muthuvinayaga Krishnan (Formwork Instructor) of Doka India Pvt. Ltd, Navi Mumbai, India for their valuable information and technical guidance on system formwork and special formwork (climbing formwork systems) Engineering. Mr. Eldo Vargehese (General Director), PASCHAL Formwork (India) Pvt. Ltd., Hyderabad, India; Mr. Ketan Shah (Managing Director), MFE Formwork Technology India Pvt. Ltd., Mumbai, India and Mr. Arul Raja (Vice President), RMD Kwikform, Chennai, India for their support during the constructability survey. The contribution of various other technical experts and discussants, directly and indirectly during the constructability survey and API-fication process are also highly regarded. The authors would like to thank the anonymous reviewers for their insightful comments and constructive suggestions that greatly contributed to enhance the quality of final version of this manuscript.
Author information
Authors and Affiliations
Corresponding author
Appendices
Appendix
Constructability information scheme for concrete formwork systems
The detailed description of the constituents of the Constructability Information Scheme (CIS) developed for the research is given in the Table 5.
Constructability survey template
The Table 6 is an actual reproduction of the form/template entitled ‘Constructability Survey’ used to obtain responses and collate intuitive feedback from various construction personnel associated with structural and formwork construction at various construction sites for this research purpose.
Rights and permissions
About this article
Cite this article
Kannan, M.R., Santhi, M.H. Automated constructability rating framework for concrete formwork systems using building information modeling. Asian J Civ Eng 19, 387–413 (2018). https://doi.org/10.1007/s42107-018-0026-3
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s42107-018-0026-3