Abstract
The decision to use a platform rig should be made prior to the design of the platform. This decision would be influenced by size of field, depth of production, radius of drainage of platform, volume of production, availability of rigs and water depth.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Rights and permissions
Copyright information
© 1983 International Human Resources Development Corporation
About this chapter
Cite this chapter
Austin, E.H. (1983). Offshore Rig Types. In: Drilling Engineering Handbook. Springer, Dordrecht. https://doi.org/10.1007/978-94-009-7261-2_6
Download citation
DOI: https://doi.org/10.1007/978-94-009-7261-2_6
Publisher Name: Springer, Dordrecht
Print ISBN: 978-90-277-1884-6
Online ISBN: 978-94-009-7261-2
eBook Packages: Springer Book Archive