Skip to main content

An Improved Self-adaptive Genetic Algorithm for Scheduling Steel-Making Continuous Casting Production

  • Conference paper
  • First Online:
Proceedings of the 6th International Asia Conference on Industrial Engineering and Management Innovation

Abstract

The steel-making continuous casting scheduling problem holds more constraints than flow shop in no-idle machine constraint, multiple buffers and batch scheduling, resulting in strong NP-hardness. Its mathematical programming model is first established based on unit-specific event-point continuous-time representation. Then a novel improved self-adaptive genetic algorithm (SAGA) is proposed to optimize the sequence among casts with the objective of reducing the total idle times on all machines and minimizing the make-span. In SAGA, the probabilities of crossover and mutation rate are rectified exquisitely and automatically so as to avoid being trapped in local optima and neighbourhood-based mutation operation is adopted to improve the diversity. Experimental comparisons with GAMS/CPLEX and other two state-of-art algorithms demonstrate the effectiveness and efficiency of SAGA in solving the large-size problems.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 149.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 189.00
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Li J, Xiao X, Tang QH, Floudas CA (2012) Production scheduling of a large-scale steelmaking continuous casting process via unit-specific event-based continuous-time models: short-term and medium-term scheduling. Ind Eng Chem Res 51(21):7300–7319

    Article  CAS  Google Scholar 

  2. Gao KZ, Pan QK, Suganthan PN, Li JQ (2013) Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization. Int J Adv Manuf Technol 66(9–12):1563–1572

    Article  Google Scholar 

  3. Tang LX, Liu GL (2007) A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan iron and steel complex. Eur J Oper Res 182(3):1453–1468

    Article  MATH  Google Scholar 

  4. Pacciarelli Dario, Pranzo Marco (2004) Production scheduling in a steelmaking-continuous casting plant. Comput Chem Eng 28(12):2823–2835

    Article  CAS  Google Scholar 

  5. Zhao Y, Jia FY, Wang GS, Wang LJ (2011) A hybrid tabu search for steelmaking-continuous casting production scheduling problem. In: International symposium on advanced control of industrial processes, ADCONIP, pp 535–540

    Google Scholar 

  6. Tang QH, Chen WM, Jiang GZ (2008) Steelmaking-continuous casting production scheduling model research based on JIT. J Wuhan Univ Sci Technol (Nat Sci Ed) 31(1):78–82

    CAS  Google Scholar 

  7. Srinivas M, Patnaik LM (1994) Adaptive probabilities of crossover and mutation in genetic algorithms. IEEE Trans Syst Man Cybern 24(4):656–667

    Article  Google Scholar 

Download references

Acknowledgments

We express our deepest gratitude to the National Science Foundation of China under grants of 51275366 and 51305311 and the Specialized Research Fund for the Doctoral Program of Higher Education of China (20134219110002). The authors also thank suggestions and comments from the anonymous referees to improve this paper.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Qiuhua Tang .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2016 Atlantis Press and the author(s)

About this paper

Cite this paper

Li, L., Tang, Q., Zheng, P., Zhang, L., Floudas, C.A. (2016). An Improved Self-adaptive Genetic Algorithm for Scheduling Steel-Making Continuous Casting Production. In: Qi, E. (eds) Proceedings of the 6th International Asia Conference on Industrial Engineering and Management Innovation. Atlantis Press, Paris. https://doi.org/10.2991/978-94-6239-148-2_40

Download citation

Publish with us

Policies and ethics