Abstract
Two principal prerequisites for project success are that the front-end phase results in a sensible strategy and that the implementation phase affords the tactical flexibility needed to accommodate promising technical options in situations that may arise. This was discussed in Chapter 7. The distinction between strategic guidance and tactical flexibility is significant in project management. In cases when a project is both financed and implemented by a single organization, conflicts of interest at the borderline between the strategic and the tactical are avoided. The organization itself can determine the extent to which tactical choices that depart from the project strategic guidance may be made. However, in many cases, the commissioner is not the same as the contractor. So, considerable conflicts of interest may arise between them, not least in the sharing of risk. The implementation of a project is influenced by internal conditions and by the surroundings with which uncertainty is associated. A choice made may result in desirable or undesirable results and consequently imply risk. The commissioner may choose to bear the relevant risk or may transfer it to the implementing party. A commissioner who opts for making tactical choices also incurs the relevant risks and must sustain any losses that arise. Likewise, a contractor allowed to make tactical choices must also bear the relevant risks. In such instances, the contractor normally will require a risk premium or a price differential to compensate for possible losses.
Keywords
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.
The logical framework yields a description of the project concept in a strategic perspective. Uncertainty associated with a concept makes it difficult to realize projects as assumed. Hence, flexibility must be allowed in implementation. That said, the flexibility should not lead to excessive aberration in strategic guidance. So strategic frame requirements should be set up for those who implement a project.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
Copyright information
© 2010 Knut Samset
About this chapter
Cite this chapter
Samset, K. (2010). Strategic Frames for Implementation. In: Early Project Appraisal. Palgrave Macmillan, London. https://doi.org/10.1057/9780230289925_21
Download citation
DOI: https://doi.org/10.1057/9780230289925_21
Publisher Name: Palgrave Macmillan, London
Print ISBN: 978-1-349-32375-3
Online ISBN: 978-0-230-28992-5
eBook Packages: Palgrave Business & Management CollectionBusiness and Management (R0)