Abstract
With increase in scale of road construction in India, it has become increasingly difficult to assess the timely completion of bridge construction. The major issue for delay is poor management of associated risks on projects. Moreover, the complexity of bridge projects further adds variety of risk factors. It is important to concentrate only on most significant risk factors which are having highest impact on timely completion of project. In this work the author brought an Analytical Hierarchical Processes (AHP) approach to identify most significant risk factors on bridge construction which are responsible for delay. Around 25 bridge case studies are considered for work. The long list of risk factors is formulated through repository of literature and bridge expert’s opinions. In the framework initially risk factors are divided in 3 level hierarchy for eliciting weightages. Then, the matrix is prepared using the pairwise comparison and the final weightages are obtained through AHP procedure. These weights are further used for prioritisation of risk factors. The main intent of this work to produce robust framework in prioritisation of risk factors predicted in bridge construction.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Project implementation status report of central sector projects costing Rs. 150 crore & above-22 (QTR-2nd) port trust-setting up of LNG regasification terminal at Puthuvypeen Cochin
Government of India ministry of road transport and highways annual report
Vigneshwaran P, Arunpandiyan M, Ashwinkumar C, Balaji M, Chandrasekaran R (2019) A study on construction challenges of bridges in the hilly areas of Tamil Nadu 1
Fredriksson A, Sezer AA, Angelakis V, Gundlegård D (2022) Construction related urban disturbances: Identification and linking with an IoT-model. Autom Constr 134. https://doi.org/10.1016/j.autcon.2021.104038
Li ZY (2014) Research on the risk assessment in bridge construction stage. Adv Mater Res 855–859. https://doi.org/10.4028/www.scientific.net/AMR.1030-1032.855
Madhumitha TS (2020) Analysing and managing bridge construction projects in India. Int Res J Eng Technol (Online). Available: www.irjet.net
Muhammad Choudhry R, Ali Aslam M (2011) Risk analysis of bridge construction projects in Pakistan
Dziadosz A, Rejment M (2015) Risk analysis in construction project—chosen methods. In: Procedia engineering. Elsevier Ltd, pp 258–265. https://doi.org/10.1016/j.proeng.2015.10.034
Mortazavi S, Kheyroddin A, Naderpour H (2020) Risk evaluation and prioritization in bridge construction projects using system dynamics approach. Pract Periodical Struct Des Constr 25(3). https://doi.org/10.1061/(asce)sc.1943-5576.0000493
Dixit S, Mandal SN, Thanikal JV, Saurabh K (2019) Study of significant factors affecting construction productivity using relative importance index in Indian construction industry. In: E3S Web of conferences, EDP sciences. https://doi.org/10.1051/e3sconf/201914009010
Shelake AG, Gogate NG, Rajhans NR (2022) An integrated approach for identification and prioritization of risk factors in tunnel construction. Mater Today Proc 65:1805–1812. https://doi.org/10.1016/j.matpr.2022.04.855
Tayade AM, Mahatme PS, Sabihuddin S (2008) Delay in bridge construction and analysis by RII method. Int Res J Eng Technol (Online). Available: www.irjet.net
Zhang W (2021) Research on risk management of cross-sea bridges based on analytic hierarchy process—taking hangzhou bay bridge as an example. World J Eng Technol 09(03):624–636. https://doi.org/10.4236/wjet.2021.93044
Suliantoro H, Fitriani N, Hario Setiadji B (2018) Risk analysis and strategic planning on bridge construction works at the toll road procurement projects in central Java Province. In: SHS web of conferences, vol 49, p 02020. https://doi.org/10.1051/shsconf/20184902020
Li Q, Lei J, Zhang H (2020) Risk estimation of large complex bridge construction based on factor analysis. In: E3S Web of conferences, EDP sciences..https://doi.org/10.1051/e3sconf/202021804011
Saaty RW (1987) The analytic hierarchy process-what it is and how it is used
Choudhry RM (2019) Risk analysis related to cost and schedule for a bridge construction project. In: Perspectives on risk, assessment and management paradigms, IntechOpen.https://doi.org/10.5772/intechopen.83501
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2024 The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Sawant, S.S., Shelake, A.G., Gogate, N.G. (2024). AHP Framework for Prioritising Risk Factors in Bridge Construction. In: Sreekeshava, K.S., Kolathayar, S., Vinod Chandra Menon, N. (eds) Recent Advances in Structural Engineering. IACESD 2023. Lecture Notes in Civil Engineering, vol 455. Springer, Singapore. https://doi.org/10.1007/978-981-99-9502-8_21
Download citation
DOI: https://doi.org/10.1007/978-981-99-9502-8_21
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-99-9501-1
Online ISBN: 978-981-99-9502-8
eBook Packages: EngineeringEngineering (R0)