Skip to main content

Identifying Communication Issues and Its Impact on the Efficiency of Construction

  • Chapter
  • First Online:
Building Construction and Technology

Part of the book series: Lecture Notes in Civil Engineering ((LNCE,volume 360))

  • 213 Accesses

Abstract

Communication is one of the main aspects which directs the project performance. Even though there are proper channels of communication in various stages of construction and in the organizational structure in all tiers, still there exist certain voids that needed to be filled in. The causes related to communication gap in construction industry are a less explored area, and there are limited studies on it. How this gap can be minimized is discussed here by identifying the prevailing communication issues and factors associated with it and assessing the impact of communication in efficiency of construction process. The study aims to escalate the role of communication among the stakeholders in enhancing the efficiency of construction process. The prevailing communication management issues in construction and the related factors that cause a gap in communication are studied through a review of literature and interviews. Further questionnaire surveys are conducted to quantify its significance level of impact on efficiency of construction. The data collected from questionnaire survey by means of ordinal level of measurement using Likert scale are ranked using relative importance index method. This research can be useful to the professionals who are engaged in the construction field, and they become more aware about the importance of better quality communication in construction process. It helps them to fill the voids by finding out areas where they lack proper communication and take necessary precautionary steps to eradicate the negative impacts of it.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 139.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 179.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Wu G, Liu C, Zhao X, Zuo J (2017) Investigating the relationship between communication-conflict interaction and project success among construction project teams. Int J Project Manage 35(8):1466–1482

    Article  Google Scholar 

  2. Zulch B (2014) Communication: the foundation of project management. Procedia Technol 16:1000–1009

    Article  Google Scholar 

  3. Olanrewaju A, Tan SY, Kwan LF (2017) Roles of communication on performance of the construction sector. Procedia Engineering 196:763–770

    Article  Google Scholar 

  4. Labour and Housing Division (2023) Department of economics and statistics, government of Kerala, Building Statistics 2019–20, Department of Economics and Statistics, Retrieved March 6, 2023, from https://ecostat.kerala.gov.in/storage/publications/17.pdf

  5. Babu CA, Hamim Jeelani S, Akthar S, Lingeshwaran N (2021) A study and identification of the time and cost overrun in the construction project. Mater Today Proc 47:5426–5431

    Google Scholar 

  6. Tariq J, Shujaa Safdar Gardezi S (2022) Study the delays and conflicts for construction projects and their mutual relationship: A Review. Ain Shams Eng J 14(1):101815

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to A. Arjun Krishna .

Editor information

Editors and Affiliations

Appendix—Questionnaire

Appendix—Questionnaire

Section 1

Name of the respondent

Location (Specify State)

Name of firm

Designation/Profession (Architect/Chartered Engineer/Project Manager/Project Coordinator/Site Engineer/Site Supervisor/Other)

Years of Experience

Types of projects mainly involved in (Residential/Commercial/Industrial/All the above/Other)

Section 2.

Measuring the impact of the following factors on efficiency of construction

Please select the number that best represent the impact on a scale of 1 to 5

1—Not at all significant, 2—Slightly significant, 3—Moderately significant,

4—Very significant, 5—Strongly significant

How significant will be the impact on efficiency of construction due to poor supply chain management?

How significant will be the impact on efficiency of construction due to ineffective reporting systems where roles and responsibilities are often misallocated and also people are unaware to whom he/she reports or who reports to him/her?

How significant will be the impact on efficiency of construction due to irregular site meetings being held?

How significant will be the impact on efficiency of construction due to lack of strategical planning in taking faster onsite decisions?

How significant will be the impact on efficiency of construction due to misinterpretation of client requirements?

How significant will be the impact on efficiency of construction due to communication gap between design and material procurement team?

How significant will be the impact on efficiency of construction due to misinterpretation of drawings by the execution team?

How significant will be the impact on efficiency of construction due to frequent interpersonal conflicts happening in site?

How significant will be the impact on efficiency of construction if instructions related to safety aspects are not conveyed to the workers and as a result accident occurred?

How significant will be the impact on efficiency of construction due to low morale in workplace?

How significant will be the impact on efficiency of construction if there is a negligence in adopting the latest advancements in communication technologies?

How significant will be the impact on efficiency of construction due to communication gap between project design and site execution team?

How significant will be the impact on efficiency of construction due to improper planning of material procurement?

How significant will be the impact on efficiency of construction due to lack of proper trained staffs?

How significant will be the impact on efficiency of construction if there is no proper communication plan and necessary information is not conveyed by proper channelization?

How significant will be the impact on efficiency of construction due to hostile working environment?

Rights and permissions

Reprints and permissions

Copyright information

© 2023 The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Krishna, A.A. (2023). Identifying Communication Issues and Its Impact on the Efficiency of Construction. In: J., V. (eds) Building Construction and Technology. Lecture Notes in Civil Engineering, vol 360. Springer, Singapore. https://doi.org/10.1007/978-981-99-3526-0_11

Download citation

  • DOI: https://doi.org/10.1007/978-981-99-3526-0_11

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-99-3525-3

  • Online ISBN: 978-981-99-3526-0

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics