Abstract
This research takes a module structure platform project in Bohai as an example, and arranges two different SPMT loading plans for the completed module structure on land, namely the north-south support beam SPMT loading plan and the north-south support column SPMT loading plan. A relevant load out model was established using SACS software, and the two load out schemes were calculated and analyzed. The results were compared, providing a reference for similar modular platform projects in the future to use SPMT loading.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Zheng, M., Wang, J., Zhao, J., et al.: Construction preparation work for offshore structure SPMT loadout. China Offshore Platform S1, 10–14 (2012)
Pan, Y., Ding, Q., Qin, Q., et al.: Summary of SPMT transportation calculation methods for large modular structure. Shandong Chem. Ind. 50(13), 59–60 (2021)
API RP 2A-2007, Recommended practice for planning, designing, and constructing fixed offshore platforms (2007)
Author information
Authors and Affiliations
Corresponding authors
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2024 The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Bian, X., Sun, H., Liang, L., Zhang, Y., Ma, Y. (2024). Comparative Analysis of Modular SPMT Load Out Methods. In: Sun, B., Sun, J., Wang, Z., Chen, L., Chen, M. (eds) Proceedings of the Fifth International Technical Symposium on Deepwater Oil and Gas Engineering. DWOG-Hyd 2023. Lecture Notes in Civil Engineering, vol 472. Springer, Singapore. https://doi.org/10.1007/978-981-97-1309-7_16
Download citation
DOI: https://doi.org/10.1007/978-981-97-1309-7_16
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-97-1308-0
Online ISBN: 978-981-97-1309-7
eBook Packages: EnergyEnergy (R0)