Skip to main content

An EPQ with Shortage Backorders Model on Imperfect Production System Subject to Two Key Production Systems

  • Conference paper
  • First Online:
Proceedings of the Institute of Industrial Engineers Asian Conference 2013

Abstract

This paper is an extension of the work of Lin and Gong (2011) on Economic Production Quantity (EPQ) model on an imperfect production system over infinite planning horizon, where the production system is dictated by two unreliable key production subsystems (KPS). While any shortage on the inventory of product was not allowed in the model of Lin and Gong (2011), planned shortage backorders is considered in the model proposed in this paper. The mathematical model is developed in order to determine production run time (τ) and production time when backorder is replenished (T 1) that minimizes the expected total cost per unit time including setup, inventory carrying, shortage, and defective costs. Approaches to solve the model are also being proposed in this paper, altogether with some numerical examples.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 189.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 249.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Ai TJ, Wigati SS, Gong DC (2012) An economic production quantity model on an imperfect production system over finite planning horizon. In: Proceedings of IIE Asian conference 2012, Singapore

    Google Scholar 

  • Ben-Daya M, Hariga M (2000) Economic lot scheduling problem with imperfect production processes. J Oper Res Soc 51:875–881

    MATH  Google Scholar 

  • Chung KJ, Hou KL (2003) An optimal production run time with imperfect production processes and allowable shortages. Comput Oper Res 30:483–490

    Article  MATH  Google Scholar 

  • Hsieh CC, Lee ZZ (2005) Joint determination of production run length and number of standbys in a deteriorating production process. Eur J Oper Res 162:359–371

    Article  MathSciNet  MATH  Google Scholar 

  • Lee HL, Rosenblatt MJ (1987) Simultaneous determination of production cycle and inspection schedules in a production system. Manage Sci 33:1125–1136

    Article  MATH  Google Scholar 

  • Lee HL, Rosenblatt MJ (1989) A production and maintenance planning model with restoration cost dependent on detection delay. IIE Trans 21:368–375

    Article  Google Scholar 

  • Lee HL, Rosenblatt MJ (1988) Economic design and control of monitoring mechanisms in automated production systems. IIE Trans 20:201–209

    Article  Google Scholar 

  • Lee JS, Park KS (1991) Joint determination of production cycle and inspection intervals in a deteriorating production system. J Oper Res Soc 42:775–783

    MATH  Google Scholar 

  • Lin GC, Gong DC (2011) On an Economic lot sizing model subject to two imperfect key production subsystems. In: Proceedings of IIE Asian conference 2011, Shanghai, China

    Google Scholar 

  • Lin TM, Tseng ST, Liou MJ (1991) Optimal inspection schedule in the imperfect production system under general shift distribution. J Chin Inst Ind Eng 8:73–81

    Google Scholar 

  • Rosenblatt MJ, Lee HL (1986) Economic production cycles with imperfect production processes. IIE Trans 18:48–55

    Article  Google Scholar 

  • Silver EA, Pyke DF, Peterson R (1998) Inventory management and production planning and scheduling, 3rd edn. Wiley, New York

    Google Scholar 

  • Sulistyo ARL, Astanti RD, Dewa DMRT (2012) Rancangan Preventive Maintenance dengan Pendekatan TPM di PT Perkebunan Nusantara VII. Unpublished thesis at Universitas Atma Jaya Yogyakarta

    Google Scholar 

Download references

Acknowledgments

This work is partially supported by Directorate General of Higher Education, Ministry of Education and Culture, Republic of Indonesia through Hibah Bersaing Research Grant and Universitas Atma Jaya Yogyakarta, Indonesia. The authors also gratefully acknowledge the helpful comments and suggestions of the reviewers, which have improved the presentation.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Baju Bawono .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer Science+Business Media Singapore

About this paper

Cite this paper

Bawono, B., Ai, T.J., Astanti, R.D., Wibowo, T.I. (2013). An EPQ with Shortage Backorders Model on Imperfect Production System Subject to Two Key Production Systems. In: Lin, YK., Tsao, YC., Lin, SW. (eds) Proceedings of the Institute of Industrial Engineers Asian Conference 2013. Springer, Singapore. https://doi.org/10.1007/978-981-4451-98-7_131

Download citation

  • DOI: https://doi.org/10.1007/978-981-4451-98-7_131

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-4451-97-0

  • Online ISBN: 978-981-4451-98-7

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics