Abstract
The construction industry has always been considered as one of the most hazardous industries globally. The condition is worse in developing countries due to poor implementation of safety management. To overcome this problem, there is a need to focus on improving the implementation of safety programs. This paper aims to identify the elements of safety programs in construction projects in developing countries. An extensive review of literature found 25 elements. Sixteen semi-structured interviews with experts in the Iraqi construction industry was conducted to gain in-depth insight and understanding of these elements. The interviewees confirmed the relevance of the elements and emphasized on the importance of several elements, including safety objectives, safety policy, safety committee, training. These elements can used as a procedure to implement safety program in developing countries construction industry. The findings can used in the Iraqi construction industries and in developing countries to support the implementation of safety program.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Kines P, Andersen LP, Spangenberg S, Mikkelsen KL, Dyreborg J, Zohar D (2010) Improving construction site safety through leader-based verbal safety communication. J Saf Res 41(5):399–406
Mahmoudi S, Ghasemi F, Mohammadfam I, Soleimani E (2014) Framework for continuous assessment and improvement of occupational health and safety issues in construction companies. Saf Health Work 5(3):125–130
Wang W-C, Liu J-J, Chou S-C (2006) Simulation-based safety evaluation model integrated with network schedule. Automation Constr 15(3):341–354
Al Haadir S, Panuwatwanich K (2011) Critical success factors for safety program implementation among construction companies in Saudi Arabia. Procedia Eng 14:148–155
Murie F (2007) Building safety—An international perspective. Int J Occup Environ Health 13(1):5–11
Facts I (2013) National Safety Council, Itasca, Ill., 2011.
Tam C, Zeng S, Deng Z (2004) Identifying elements of poor construction safety management in China. Saf Sci 42(7):569–586
Othman I, Kamil M, Sunindijo RY, Alnsour M, Kineber AF (2020) Critical success factors influencing construction safety program implementation in developing countries. J Phys Conf Ser 1529(4):042079. IOP Publishing
Rowlinson S (2004) Construction safety management systems. Routledge
Buniya MK, Othman I, Sunindijo RY, Kineber AF, Mussi E, Ahmad H (2020) Barriers to safety program implementation in the construction industry. Ain Shams Eng J
Aminbakhsh S, Gunduz M, Sonmez R (2013) Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects. J Saf Res 46:99–105
Fredericks TK, Abudayyeh O, Choi SD, Wiersma M, Charles M (2005) Occupational injuries and fatalities in the roofing contracting industry. J Constr Eng Manag 131(11):1233–1240
Rowlinson SM (2003) Hong Kong construction: safety management and the law. Sweet & Maxwell Asia Causeway Bay, Hong Kong
Hallowell MR, Hinze JW, Baud KC, Wehle A (2013) Proactive construction safety control: Measuring, monitoring, and responding to safety leading indicators. J Constr Eng Manag 139(10):04013010
Tam C, Fung IW IV, Chan AP (2001) Study of attitude changes in people after the implementation of a new safety management system: the supervision plan. Constr Manag Econ 19(4):393–403
Poon W, Ma C, Ho K (2000) Statistical analysis on factors in reducing construction site accident frequency rate in Hong Kong. In: Proceedings of the 6th annual conference of the Australian and New Zealand association of occupational health and safety educators, Hong Kong, pp 341–355
Findley M, Smith S, Kress T, Petty G, Kim E (2004) Safety program elements in construction. Prof Saf 49(2):14
Hinze J, Gambatese J (2003) Factors that influence safety performance of specialty contractors. J Constr Eng Manag 129(2):159–164
Osha U (2010) Department of labor. In: Hazards associated with shipbreaking
Hinze J (2002) Safety plus: making zero accidents a reality. Construction Industry Institute, pp 160–11
Dougherty D (2015) US Department of Labor Assistant Secretary for
Hallowell MR, Gambatese JA (2009) Construction safety risk mitigation. J Constr Eng Manag 135(12):1316–1323
Hinze J, Hallowell M, Baud K (2013) Construction-safety best practices and relationships to safety performance. J Constr Eng Manag 139(10):04013006
Darabont DC, Antonov AE, Bejinariu C (2017) Key elements on implementing an occupational health and safety management system using ISO 45001 standard. In: MATEC web of conferences, vol 121. EDP Sciences, p 11007
Eeckelaert L et al (2012) Review of workplace innovation and its relation with occupational safety and health. European Agency for Safety and Health at Work, Bilbao
Darabont DC, Bejinariu C, Ionita I, Bernevig-Sava M-A, Baciu C, Baciu E-R (2018) Considerations on improving occupational health and safety performance in companies using ISO 45001 standard. Environ Eng Manag J (EEMJ) 17(11)
 Buniya MK, Othman I, Durdyev S, Sunindijo RY, Ismail S, Kineber AF (2021) Safety Program Elements in the Construction Industry: The Case of Iraq. Int J Environ Res Public Health 18(411)
Rajendran S, Gambatese JA (2009) Development and initial validation of sustainable construction safety and health rating system. J Constr Eng Manag 135(10):1067–1075
Othman I, Kineber A, Oke A, Zayed T, Buniya M (2020) Barriers of value management implementation for building projects in Egyptian construction industry. Ain Shams Eng J
Belson WA (1986) Validity in survey research: with special reference to the techniques of intensive interviewing and progressive modification for testing and constructing difficult or sensitive measures for use in survey research: a report. Gower Publishing Company, Limited
Bradburn NM et al (1979) Improving interview method and questionnaire design: response effects to threatening questions in survey research. Jossey-Bass, San Francisco
Othman I, Kineber A, Oke A, Khalil N, Buniya M (2020) Drivers of value management implementation in building projects in developing countries. J Phys Conf Ser 1529(4):042083. IOP Publishing
Kineber, Othman AF, Oke I, Chileshe AE, Buniya N, Kamil M (2021) Impact of value management on building projects success: structural equation modeling approach. J Constr Eng Manage 147(4) PP. 04021011
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2021 The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Buniya, M.K., Othman, I., Sunindijo, R.Y., Kineber, A.F., Alnsour, M. (2021). Elements of Safety Program Implementation in Developing Countries Construction Industries. In: Bin Meor Razali, A.M.M.F., Awang, M., Emamian, S.S. (eds) Advances in Civil Engineering Materials. Lecture Notes in Civil Engineering, vol 139. Springer, Singapore. https://doi.org/10.1007/978-981-33-6560-5_9
Download citation
DOI: https://doi.org/10.1007/978-981-33-6560-5_9
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-33-6559-9
Online ISBN: 978-981-33-6560-5
eBook Packages: EngineeringEngineering (R0)