Abstract
Change Order is a written and valid work order that changes the scope of the original contract, with compensation agreed upon by the owner and contractor. Changes can be in the form of adding or reducing the scope of work, material changes, or schedule changes. The Change Order that occurred in Banten Province stated the value of the percentage change order for various works on road projects expressed in the type of road construction. The changes that occur are job changes due to added work and changes due to less work. The purpose of this study is to determine the type of road construction that occurs in 5 change order contracts for road construction projects and the results are the largest changes in the type of drainage work construction, both the changes themselves and changes to additional work Changes due to work are less in the largest type of construction in Condition Returns and Minor Works.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Sulistio H, Waty M (2008) Analysis and evaluation change order in flexible pavement (case study: road projects in East Kalimantan). Media Komunikasi Teknik Sipil 16(1):31–47
Lim M (2013) Analisa change order pada Proyek Perkerasan Jalan. Thabi’ Press, Bandung
Goudreau H (2021) The five key elements of every construction contract—forget them and you're in trouble!. http://www.hgassociates.com/article_contracts.html. Accessed 29 Aug 2021
Al-Momani AH (2000) Construction delay: a quantitative analysis. Int J Project Manage 18(1):51–59
Taylor TR, Uddin M, Goodrum PM, McCoy A, Shan Y (2012) Change orders and lessons learned: knowledge from statistical analyses of engineering change orders on Kentucky highway projects. J Constr Eng Manag 138(12):1360–1369
Waty M, Sulistio H (2020) Perhitungan change order proyek jalan di banten. Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan 4(2):211–220
Hsieh TY, Lu ST, Wu CH (2004) Statistical analysis of causes for change orders in metropolitan public works. Int J Project Manage 22(8):679–686
Direktorat Jendral Bina Marga (2018) Spesifikasi Umum 2018. Direktorat Jendral Bina Marga, Departemen Pekerjaan Umum, Jakarta
Republik Indonesia R (2010) Peraturan Presiden Republik Indonesia Nomor 54 Tahun 2010 Tentang Pengadaan Barang/Jasa Pemerintah. Sekretariat Kabinet RI, Jakarta
Acknowledgements
We would like to thank the Institute for Research and Community Service of Tarumanagara University which has helped fund this research.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2022 The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Waty, M., Sulistio, H. (2022). Analysis of Change Orders Based on the Type of Road Construction. In: Lie, H.A., Sutrisna, M., Prasetijo, J., Hadikusumo, B.H., Putranto, L.S. (eds) Proceedings of the Second International Conference of Construction, Infrastructure, and Materials. Lecture Notes in Civil Engineering, vol 216. Springer, Singapore. https://doi.org/10.1007/978-981-16-7949-0_43
Download citation
DOI: https://doi.org/10.1007/978-981-16-7949-0_43
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-16-7948-3
Online ISBN: 978-981-16-7949-0
eBook Packages: EngineeringEngineering (R0)