Abstract
This paper presents the design optimization for reinforced concrete structure done in order to minimize the cost of the concrete and steel for pile by selecting different span length in marine approach jetty, POL berth, Mormugao, Goa. Dimensions of approach jetty is 200 m length × 15 m width. The purpose of the approach jetty is to carry vehicles and oil pipelines. Live load of 30 kN/m2/Class 70R (wheeled) from IRC is considered for the jetty design. The proposed location falls under seismic zone III. Piles are founded in sandstone at a depth of (−)32 m CD. Two options (I and II) were explored for the above considerations, and the feasible alternative has been arrived at cost-effective, robust design, and time-sensitive manner.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2021 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Sundaravadivelu, R., Sakthivel, S., Balaji, H. (2021). Optimization in Selecting Member Size in an Approach Jetty, Mormugao, Goa. In: Sundar, V., Sannasiraj, S.A., Sriram, V., Nowbuth, M.D. (eds) Proceedings of the Fifth International Conference in Ocean Engineering (ICOE2019). Lecture Notes in Civil Engineering, vol 106. Springer, Singapore. https://doi.org/10.1007/978-981-15-8506-7_40
Download citation
DOI: https://doi.org/10.1007/978-981-15-8506-7_40
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-15-8505-0
Online ISBN: 978-981-15-8506-7
eBook Packages: EngineeringEngineering (R0)