Skip to main content

Project Scheduling with Exact Distribution Method (EDM), Chance-Constrained Programming (CCP), and Simulation

  • Chapter
  • First Online:
Project Management

Part of the book series: Management and Industrial Engineering ((MINEN))

Abstract

What are the limitations of CPM and PERT-based project scheduling?

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 79.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 99.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jitesh J. Thakkar .

Rights and permissions

Reprints and permissions

Copyright information

© 2022 Springer Nature Singapore Pte Ltd.

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Thakkar, J.J. (2022). Project Scheduling with Exact Distribution Method (EDM), Chance-Constrained Programming (CCP), and Simulation. In: Project Management. Management and Industrial Engineering. Springer, Singapore. https://doi.org/10.1007/978-981-15-3695-3_6

Download citation

  • DOI: https://doi.org/10.1007/978-981-15-3695-3_6

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-15-3694-6

  • Online ISBN: 978-981-15-3695-3

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics