Abstract
The machine manufacturing company specialized in building customized (engineered-to-order) machines ordered for certain purposes. The company faces a problem in which it can not be able to finish the received orders within the estimated duration. In the last 5 years, the percentage of production delay in manufacturing the engineered-to-order machines is 80%. The inability to meet the production due date is caused by the company does not have the right scheduling mechanism to schedule every activity in production. Due to the similarity of characteristics, the production of customized machines can be considered as a project. This paper aims to find an efficient yet effective way to schedule project manufacture and allocate the resources for such projects. To serve this purpose, the resource constrained multi project optimization model was applied in a real case study. The objective function of the model is to minimize the completion time of the projects when run simultaneously. The resource constrained multi project optimization model was solved using LINGO 15.0 and shows that the projects can be completed in 133 days. This result will make the company to save IDR 17,200,000 compared to the existing project schedule.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
El-Mehalawi, M.: Scheduling and controls of project manufacturing. In: Proceedings of 8th Annual PMI College of Scheduling Conference, San Fransisco, US, pp. 1–7 (May 2011)
Fox, S., Jokinen, T., Lindfors, N., Ylen, J.P.: Formulation of robust strategies for project manufacturing business. Int. J. Manag. Proj. Bus. 2(2), 217–237 (2008)
Taghizadeh, H., Zeinalzadeh, A.: Application of project management approaches for planning in engineer-to-order production. Middle-East J. Sci. Res. 10(5), 581–591 (2011)
Dimyati, H., Nurjaman, K.: Project Management, 1st edn. (in Bahasa). Pustaka Setia, Bandung (2014)
Bowman, E.H.: The schedule-sequencing problem. Oper. Res. 7, 621–624 (1959)
Wagner, H.: An integer linear programming model for machine scheduling. Naval Res. Logistics Q. 6, 131–140 (1959)
Manne, A.S.: On the job-shop scheduling problem. Oper. Res. 8, 219–223 (1960)
Pritsker, A.A.B., Watters, L.J., Wolfe, P.M.: Multiproject scheduling with limited resources: a zero-one programming approach. Manag. Sci. 16, 93–108 (1969)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Marpaung, S.T., Rosyidi, C.N., Jauhari, W.A. (2020). Project Manufacture Scheduling Using Resource Constrained Multi Project Optimization Model (A Case Study in Machine Manufacturing Company Solo). In: Osman Zahid, M., Abd. Aziz, R., Yusoff, A., Mat Yahya, N., Abdul Aziz, F., Yazid Abu, M. (eds) iMEC-APCOMS 2019. iMEC-APCOMS 2019. Lecture Notes in Mechanical Engineering. Springer, Singapore. https://doi.org/10.1007/978-981-15-0950-6_39
Download citation
DOI: https://doi.org/10.1007/978-981-15-0950-6_39
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-15-0949-0
Online ISBN: 978-981-15-0950-6
eBook Packages: EngineeringEngineering (R0)