Project Manufacture Scheduling Using Resource Constrained Multi Project Optimization Model (A Case Study in Machine Manufacturing Company Solo)

  • Conference paper
  • First Online:
iMEC-APCOMS 2019 (iMEC-APCOMS 2019)

Abstract

The machine manufacturing company specialized in building customized (engineered-to-order) machines ordered for certain purposes. The company faces a problem in which it can not be able to finish the received orders within the estimated duration. In the last 5 years, the percentage of production delay in manufacturing the engineered-to-order machines is 80%. The inability to meet the production due date is caused by the company does not have the right scheduling mechanism to schedule every activity in production. Due to the similarity of characteristics, the production of customized machines can be considered as a project. This paper aims to find an efficient yet effective way to schedule project manufacture and allocate the resources for such projects. To serve this purpose, the resource constrained multi project optimization model was applied in a real case study. The objective function of the model is to minimize the completion time of the projects when run simultaneously. The resource constrained multi project optimization model was solved using LINGO 15.0 and shows that the projects can be completed in 133 days. This result will make the company to save IDR 17,200,000 compared to the existing project schedule.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. El-Mehalawi, M.: Scheduling and controls of project manufacturing. In: Proceedings of 8th Annual PMI College of Scheduling Conference, San Fransisco, US, pp. 1–7 (May 2011)

    Google Scholar 

  2. Fox, S., Jokinen, T., Lindfors, N., Ylen, J.P.: Formulation of robust strategies for project manufacturing business. Int. J. Manag. Proj. Bus. 2(2), 217–237 (2008)

    Article  Google Scholar 

  3. Taghizadeh, H., Zeinalzadeh, A.: Application of project management approaches for planning in engineer-to-order production. Middle-East J. Sci. Res. 10(5), 581–591 (2011)

    Google Scholar 

  4. Dimyati, H., Nurjaman, K.: Project Management, 1st edn. (in Bahasa). Pustaka Setia, Bandung (2014)

    Google Scholar 

  5. Bowman, E.H.: The schedule-sequencing problem. Oper. Res. 7, 621–624 (1959)

    Article  Google Scholar 

  6. Wagner, H.: An integer linear programming model for machine scheduling. Naval Res. Logistics Q. 6, 131–140 (1959)

    Article  MathSciNet  Google Scholar 

  7. Manne, A.S.: On the job-shop scheduling problem. Oper. Res. 8, 219–223 (1960)

    Article  MathSciNet  Google Scholar 

  8. Pritsker, A.A.B., Watters, L.J., Wolfe, P.M.: Multiproject scheduling with limited resources: a zero-one programming approach. Manag. Sci. 16, 93–108 (1969)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Cucuk Nur Rosyidi .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Marpaung, S.T., Rosyidi, C.N., Jauhari, W.A. (2020). Project Manufacture Scheduling Using Resource Constrained Multi Project Optimization Model (A Case Study in Machine Manufacturing Company Solo). In: Osman Zahid, M., Abd. Aziz, R., Yusoff, A., Mat Yahya, N., Abdul Aziz, F., Yazid Abu, M. (eds) iMEC-APCOMS 2019. iMEC-APCOMS 2019. Lecture Notes in Mechanical Engineering. Springer, Singapore. https://doi.org/10.1007/978-981-15-0950-6_39

Download citation

  • DOI: https://doi.org/10.1007/978-981-15-0950-6_39

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-15-0949-0

  • Online ISBN: 978-981-15-0950-6

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics