Comparative Study on Change Orders in Building Projects

  • Conference paper
  • First Online:
GCEC 2017 (GCEC 2017)

Part of the book series: Lecture Notes in Civil Engineering ((LNCE,volume 9))

Included in the following conference series:

Abstract

This research aimed to contribute to the small but growing empirical literatures and studies on Change Orders in building construction industry in selected cities in the National Capital Region (NCR), Philippines. Using descriptive/survey research method specifically expert sampling method, key informant interviews, actual site observations and desk reviews of project documents (e.g., contract documents, plans and specifications, etc.), this study investigated and compared the causes and effects of Change Orders in public and private building construction projects and formulated recommendations and guidelines in order to address the problems brought about by Change Orders. Moreover, the existing change order management control practices being implemented by the contractors, consultants, and clients in response to the issuance of construction Change Orders were also identified and investigated. Based on the results of the study, it was found out that the major causes of Change Orders in building construction projects in the Philippines were related to change of plans and scope by the owner, adjustment of schedule, unpredictable weather conditions, unforeseen site conditions, change of schedule by the owner, long waiting time for approval of construction drawings, complexity of construction projects and external factors which are beyond the control of the contractors, consultants, and clients. Consequently, Change Orders have resulted to project time extension and delay in project completion, increase in the overall cost of the project, changes in the cash flow and loss of earnings, additional payments to the contractor, and increased time and material related charges. Generally, the management control practices being undertaken by both the public and private sector in dealing with Change Orders were as follows: (i) all changes in the design documents were checked, reviewed, and justified by the designers and consultants; (ii) coordination and cooperation among the contractors, consultants, and clients were encouraged; (iii) project personnel take proactive measures to promptly settle, authorize, and execute Change Orders in construction projects; (iv) involvement of knowledgeable persons or representatives during the change order negotiation and approval (v) a written approval of both parties should be made with clear scope of change before executing the requested changes or variations; and (vi) the use of various techniques in order to track cost of changes.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 189.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 249.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Al-Dubaisi, A.H.: Change orders in construction projects in Saudi Arabia, Master’s thesis. Available from Dissertations and Theses database (UMI No. 1399744) (2000)

    Google Scholar 

  2. Alaryan, A., Elshahat, A., Dawood, M.: Causes and effects of change orders on construction projects in Kuwait. Int. J. Eng. Res. Appl. 4(7), 1–8 (2014)

    Google Scholar 

  3. Alnuaimi, A.S., Taha, R.A., Mohsin, M.Al, Al-harthi, A.S.: Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. J Constr. Eng. Manage. 136, 615–623 (2010)

    Article  Google Scholar 

  4. Aneesa, M.M., Mohamed, H.E., Abdel, R.: Evaluation of change management efficiency of construction constractors. HBRC J. 9, 77–85 (2013)

    Article  Google Scholar 

  5. Clare, B.S.: Reviewing change orders 101. AACE Int. Trans., 1–5 (2008)

    Google Scholar 

  6. Egan, J.J., Seder, J.E., Anderson, D.L.: Practices in construction change order management. Cost Eng., 12–17 (April 2012)

    Google Scholar 

  7. Fraenkel, J., Wallen, N.: How to design and evaluate research in education, 8th edn. McGraw-Hill Education, New York (2007)

    Google Scholar 

  8. Hwang, B.G., Low, L.K.: Construction project change management in Singapore: status, importance and impact. Int. J. Project Manage. 30(7), 817–826 (2012). https://doi.org/10.1016/j.ijproman.2011.11.001

    Article  Google Scholar 

  9. Ibbs, C.: Change’s impact on construction productivity. J. Constr. Eng. Manage. 123(1), 89–97 (1997)

    Article  Google Scholar 

  10. Ibn-homaid, N.T., Eldosouky, A.I., Al-ghamdi, M.A.: Change orders in Saudi linear construction projects. Emirates J. Eng. Res. 16(1), 33–42 (2011)

    Google Scholar 

  11. Ijaola, I.A., Iyagba, R.O.: A comparative study of causes of change orders in public construction project in Nigeria and Oman. J. Emerg. Trends Econ. Manage. Sci. 3(5), 495–501 (2012)

    Google Scholar 

  12. Ismail, A., Pourrostam, T., Soleymanzadeh, A., Ghouyounchizad, M.: Factors causing variation orders and their effects in Roadway construction projects. Res. J. Appl. Sci. Eng. Technol. 4(23), 4969–4972 (2012)

    Google Scholar 

  13. Levin, J.A., Fox, J.A.: Elementary statistics in social research: essentials, 3rd edn. Northeastern University, Boston (1997)

    Google Scholar 

  14. Love, P.E., Holt, G.D., Shen, L.Y., Li, H., Irani, Z.: Using systems dynamics to better understand change and rework in construction project management systems. Int. J. Proj. Manag. 20(6), 425–436 (2002)

    Article  Google Scholar 

  15. Molly, K.K.: Six steps for successful change order management. Cost Eng. 49(4), 12–20 (2007)

    Google Scholar 

  16. Motawa, I., Anumba, C., Lee, S., Peña-Mora, F.: An integrated system for change management in construction. Autom. Construc. 16(3), 368–377 (2007)

    Article  Google Scholar 

  17. Osman, Z., Omran, A., Foo, C.K.: The potential effects of variation orders in construction projects. J. Eng. Ann. Fac. Eng. Hunedoara 2, 141–152 (2009)

    Google Scholar 

  18. Philippine Domestic Construction Board: A primer on PD no. 1594 and its implementing rules & regulations as amended. Philippine Domestic Construction Board, Makati, Metro Manila (1989)

    Google Scholar 

  19. Rodriguez, J.: Five (5) situations that might trigger a change order request. Retrieved from: http://construction.about.com/od/Claims-Management/a/Common-Causes-For-A-Change-Order.htm (2016)

  20. Serag, E., Oloufa, A., Malone, L., Radwan, E.: Model for quantifying the impact of change orders on project cost for U.S. roadwork construction. J. Constr. Eng. Manage. 136, 1015–1027 (2010)

    Article  Google Scholar 

  21. Sun, M., Meng, X.: Taxonomy for change causes and effects in construction projects. Int. J. Project Manage. 27(6), 560–572 (2009). https://doi.org/10.1016/j.ijproman.2008.10.005

    Article  Google Scholar 

  22. Sundaram R.: Managing change order costs in construction projects: how owners can stay on top. Retrieved from https://www.fgould.com/americas/articles/managing-change-order-costs-construction-projects (2012)

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jerome Jordan F. Famadico .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Famadico, J.J.F., Baccay, M.A. (2019). Comparative Study on Change Orders in Building Projects. In: Pradhan, B. (eds) GCEC 2017. GCEC 2017. Lecture Notes in Civil Engineering , vol 9. Springer, Singapore. https://doi.org/10.1007/978-981-10-8016-6_8

Download citation

  • DOI: https://doi.org/10.1007/978-981-10-8016-6_8

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-10-8015-9

  • Online ISBN: 978-981-10-8016-6

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics