Skip to main content

The Appliance of BOP Auxiliary System Centralized Control Network in Nuclear Power Plant

  • Conference paper
  • First Online:
Nuclear Power Plants: Innovative Technologies for Instrumentation and Control Systems (SICPNPP 2017)

Abstract

BOP auxiliary system centralized control network is not adopted in nuclear power plant at home and abroad. Local monitoring and control based on PLC is still the main traditional control mode for BOP system, the phenomenon of isolated information island exists in nuclear power plant. The information level of this mode is not only relatively low but also bring a lot of inconveniences for equipment spare part management, maintenance, system operation. With the development of network technology, the BOP centralized control network is a main trend in BOP auxiliary system design. The adaptation of BOP auxiliary system centralized control network is bound to impact the original project schedule, design interface, procurement, cost, and so on. It aims to provide feasible technical reference for the appliance of BOP auxiliary system control network in nuclear power plant.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Guangdong nuclear training centre, devices & systems of 900 MW PWR. Atomic Energy Press (2007)

    Google Scholar 

  2. Tianhong, Technical rule of thermal power automation design for auxiliary system (shop) of fuel power plant (DL/T 5227-2005)

    Google Scholar 

  3. HAF 102: Safety of Nuclear Power Plant Design Regulations (2004)

    Google Scholar 

  4. Tao, Y.R., Jiang, M.Y.: Application of Digital Computers to Instrumentation and Control in Nuclear Power Plant (EJ/T 1060) (1998)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Lei Jiang .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Jiang, L. (2018). The Appliance of BOP Auxiliary System Centralized Control Network in Nuclear Power Plant. In: Xu, Y., Gao, F., Chen, W., Liu, Z., Gu, P. (eds) Nuclear Power Plants: Innovative Technologies for Instrumentation and Control Systems. SICPNPP 2017. Lecture Notes in Electrical Engineering, vol 455. Springer, Singapore. https://doi.org/10.1007/978-981-10-7416-5_21

Download citation

  • DOI: https://doi.org/10.1007/978-981-10-7416-5_21

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-10-7415-8

  • Online ISBN: 978-981-10-7416-5

  • eBook Packages: EnergyEnergy (R0)

Publish with us

Policies and ethics