Application of Building Information Modeling (BIM) in Site Management—Material and Progress Control

  • A. NadeemEmail author
  • A. K. D. Wong
  • G. Akhanova
  • S. Azhar
  • S. N. Wong
Conference paper

Abstract

In order to improve communication on a construction site, this research focuses on the use of Building Information Modeling (BIM) in site management for material and progress control in Hong Kong. Components of site management as well as the suitable aspects of applying BIM in site management were identified. Case studies of BIM implementation on two construction projects were presented. Interviews were arranged with BIM professionals, including consultants and contractors. The limitations of adopting BIM on site management were also analyzed. The results and analysis showed that the application of BIM in material and progress control was mainly for quantity takeoff, construction sequence optimization and provision of knowledge database. This database encouraged interaction between parties because an informative BIM model could not be produced by just one party. The findings show that the visualization from BIM 3D/4D model helps engineers or planners to become more confident about real happenings on the construction site. It can also help to identify and resolve the material and progress control related problems before construction commences.

Keywords

Building information modeling (BIM) Site management Material control Progress control 

References

  1. Ashcraft HW (2008) Building information modeling: a framework for collaboration. Constr Law 28(3). American Bar AssociationGoogle Scholar
  2. Chau KW, Anson M Saram DDD (2005) 4D dynamic construction management and visualization software: 2. Site trial. Autom Constr 14(4):525–536Google Scholar
  3. Conocer D, Crawley D, Hagan S, et al (2009) An introduction to building information modeling: a guide for ASHRAE members. American Society of Heating Refrigerating and Air-Conditioning Engineers, IncGoogle Scholar
  4. Drogemuller R, Tucker S (2009) Automating the extraction of quantities. CSIRO Division of Manufacturing & Infrastructure Technology, AustraliaGoogle Scholar
  5. Eastman C, Tecicholz P, Sacks R, Liston K (2008) BIM handbook: a guide to building information modeling for owners, managers, designers, engineers, and contractors. Wiley, Hoboken, New JerseyGoogle Scholar
  6. Hardin B (2009) BIM and construction management: proven tools, methods, and workflows, 1st edn. Wiley Publishing Inc., Indianapolis, IndianaGoogle Scholar
  7. Koohang A, Harman K, Britz J (2008) Knowledge management: research & application. Informing Science Press, Santa Rosa, California, USAGoogle Scholar
  8. McGraw Hill Construction (2008) SmartMarket report on building information modeling: transforming design and construction to achieve greater industry productivity. McGraw Hill Construction LimitedGoogle Scholar
  9. NIBS (National Institute of Building Sciences) (2007) National building information modeling standard version 1.0—Part 1: overview, principles, and methodologies. National Institute of Building Sciences, Facility Information Council. 27 Dec 2007Google Scholar
  10. Rodriquez R, Walter E (1998) Quantitative techniques for construction site layout planning. U.M.I, Ann Arbor, MichGoogle Scholar
  11. Rosenberg TL (2006) Building information modeling. Roetzel & AndressGoogle Scholar
  12. Scottdale AZ (2009) Press release: BIM goes “5D”, dramatically reducing construction costs. Available at: http://goo.gl/vU1pQv

Copyright information

© Springer Nature Singapore Pte Ltd. 2018

Authors and Affiliations

  • A. Nadeem
    • 1
    Email author
  • A. K. D. Wong
    • 2
  • G. Akhanova
    • 1
  • S. Azhar
    • 3
  • S. N. Wong
    • 2
  1. 1.Department of Civil EngineeringNazarbayev UniversityAstanaKazakhstan
  2. 2.Department of Building and Real EstateThe Hong Kong Polytechnic UniversityHong KongChina
  3. 3.McWhorter School of Building ScienceAuburn UniversityAlabamaUSA

Personalised recommendations