Abstract
Components associated with the procurement cost are explained. With respect to certain changes, procurement cost might get reduced or increased. With procurement cost reduction, effects on the output parameters such as total relevant cost and procurement lot size are presented in this chapter. In the context of procurement cost increase, such effects are also discussed. After incorporating stock out inclusion, results are tabulated with reference to a downward or upward revision of purchase cost.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2017 Springer Nature Singapore Pte Ltd.
About this chapter
Cite this chapter
Sharma, S. (2017). Procurement Cost. In: Inventory Parameters. Springer, Singapore. https://doi.org/10.1007/978-981-10-4545-5_5
Download citation
DOI: https://doi.org/10.1007/978-981-10-4545-5_5
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-10-4544-8
Online ISBN: 978-981-10-4545-5
eBook Packages: EngineeringEngineering (R0)