Abstract
In this paper, the selection of witness points in quality plan, key points in equipment supervision as well as supervision risks have been investigated through the supervision planning of EDG used in Hualong #1 nuclear unit, the third generation with proprietary intellectual property right of China, adhering to the principles of ‘Key supervision for key equipment’ and ‘Enhanced control on weak points’. The aim of this work is to enhance the efficiency and improve the quality control in supervision. And this paper can be used as a beneficial reference for the improvement of supervision efficiency and quality management of NPS.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
FQZ210AR025CPMB06CT Procurement Contract on Fuqing Nuclear Power Station Units 5&6 for EDG and Auxiliary Power Source
CP03G9001 Technical Specification of EDG
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer Science+Business Media Singapore
About this paper
Cite this paper
Li, J., Ge, W. (2017). Quality Control of Application Research on Supervision Planning of Hualong #1 Emergency Diesel Generator. In: Jiang, H. (eds) Proceedings of The 20th Pacific Basin Nuclear Conference. PBNC 2016. Springer, Singapore. https://doi.org/10.1007/978-981-10-2317-0_36
Download citation
DOI: https://doi.org/10.1007/978-981-10-2317-0_36
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-10-2316-3
Online ISBN: 978-981-10-2317-0
eBook Packages: EnergyEnergy (R0)