Abstract
There has been a growing demand on developments in remote areas. Apart from enjoying the associated benefits, architectural, construction and engineering (AEC) firms also face unique challenges to manage remote construction projects. This study adopted a case study approach to investigate the challenges and strategies of managing remote projects. The results showed that human resources, material supply and communication present most significant issues in remote construction projects. To overcome these issues, contractors are encouraged to engage local trades and suppliers. These results provide a useful reference to industry practitioners to manage remote projects.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Ewing R, Fenner S, Kennedy S, Rahman J (2007) Recent productivity outcomes and Australia’s potential growth’ economic roundup, viewed 28/08/11. http://www.treasury.gov.au/documents/1304/PDF/Economic%20Roundup%20Winter%202007.pdf#page=53
Australian Bureau of Statistics (2000) The Australian mining industry: from settlement to 2000, Cat 8414.0
BHP Billiton (2011) Olympic dam expansion EIS—Roxby downs and regional communities, viewed 13/11/11. http://www.bhpbilliton.com/home/aboutus/regulatory/Documents/Olympic%20Dam%20Supplementary%20EIS/Information%20Sheets/Olympic%20Dam%20EIS%20Roxby%20Downs%20And%20Regional%20Communities.pdf
Moselhi O, Poulton C (1991) Planning and control of remote projects. J Manage Eng 7(1):83–97
Kestle L, London K, Bodger P, Storey B (2002) The development of a typology for remote construction projects. In: The 18th annual ARCOM conference. Association of Researchers in Construction Management, London, 2–4 September 2002
McAnulty S, Baroudi B (2010). Construction challenges in remote Australian locations. In: 26th annual ARCOM conference, Leeds. Association of Researchers in Construction Management, UK, 6–8 September 2010
Storey K (2001) Fly-in/fly-out and fly-over: mining and regional development in Western Australia. Aust Geogr 32(2):133–148
Houghton DS (1993) Long-distance commuting: a new approach to mining in Australia. Geogr J, 281–290
Shelbourn M, Bouchlaghem NM, Anumba C, Carrillo P (2007) Planning and implementation of effective collaboration in construction projects. Constr Innov Inform Proc Manage 7(4):357–377
Nitithamyong P, Skibniewski MJ (2004) Web-based construction project management systems: how to make them successful? Autom Constr 13(4):491–506
Sidawi B (2010) The use of advanced electronic management systems to manage remote projects in the kingdom of Saudi Arabia. In: 26th annual ARCOM conference, Leeds. Association of Researchers in Construction Management, UK, 6–8 September 2010, pp 633–642
Sambasivan M, Soon YW (2007) Causes and effects of delays in Malaysian construction industry. Int J Project Manage 25(5):517–526
Thomas HR, Riley DR, Messner JI (2005) Fundamental principles of site material management. J Const Eng Manage 131(7):808–815
Harris F, McCaffer R, Edum-Fotwe F (2006) Modern construction management. Wiley, New York
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer Science+Business Media Singapore
About this paper
Cite this paper
Hay, A., Zuo, J., Han, S., Zillante, G. (2017). Lessons Learned from Managing a Remote Construction Project in Australia. In: Wu, Y., Zheng, S., Luo, J., Wang, W., Mo, Z., Shan, L. (eds) Proceedings of the 20th International Symposium on Advancement of Construction Management and Real Estate. Springer, Singapore. https://doi.org/10.1007/978-981-10-0855-9_83
Download citation
DOI: https://doi.org/10.1007/978-981-10-0855-9_83
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-10-0854-2
Online ISBN: 978-981-10-0855-9
eBook Packages: EngineeringEngineering (R0)