Skip to main content

Part of the book series: Managing Forest Ecosystems ((MAFE,volume 3))

Abstract

Each National Park Service unit in the United States produces a resource management plan (RMP) every four years or less. These plans constitute a strategic agenda for a park. Later, tactical plans commit budgets and personnel to specific projects over the planning horizon. Yet, neither planning stage incorporates much quantitative and analytical rigor and is devoid of formal decision-making tools. The analytic hierarchy process (AHP) offers a structure for multi-objective decision making so that decision makers’ preferences can be formally accounted for. Preferences for each RMP project, resulting from an AHP exercise, can be used as priorities in an overall RMP. We conducted an exercise on the Olympic National Park (NP) in Washington, selecting eight projects as typical of those considered in RMPs. Five members of the park staff used the AHP to prioritise the eight projects with respect to implicit management objectives. By altering management priorities for the park, three different scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 RMP contains.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • Fox, D.G., Bernabo, J. C. and Hood, B. 1987. Guidelines for measuring the physical, chemical, and biological condition of wilderness ecosystems. USDA Forest Service General Technical Report RM-146. Rocky Mountain Research Station, Fort Collins, Colorado.

    Google Scholar 

  • Hinds, W.T. 1984. Towards monitoring of long-term trends in terrestrial ecosystems. Environmental Conservation 11: 11–18.

    Article  CAS  Google Scholar 

  • Johnson, K. N. 1986. FORPLAN Version 1: an overview. Land Management Planning System Section, USDA Forest Service, Fort Collins, Colorado.

    Google Scholar 

  • Johnson, K. N. and Jones, D. B. 1979. A user’s guide to Multiple Use-Sustained Yield Resource Scheduling Calculation (MUSYC). Land Management Planning System Section, USDA Forest Service, Fort Collins, Colorado.

    Google Scholar 

  • Johnson, K. N., Stuart, T. W. and Crim, S.A. 1986. FORPLAN Version 2 — an overview. Land Management Planning System Section, USDA Forest Service, Fort Collins, Colorado.

    Google Scholar 

  • Kangas, J. 1994. An approach to public participation in strategic forest planning. Forest Ecology and Management 70: 75–88.

    Article  Google Scholar 

  • Navon, D. I. 1971. Timber RAM:. a long-range planning method for commercial timber lands under multiple-use management. USDA Forest Service Research Paper PSW-70.

    Google Scholar 

  • Peterson, D. L., Schmoldt, D. L. and Silsbee, D. G. 1994. A case study of resource management planning with multiple objectives and projects. Environmental Management 18: 729–742.

    Article  Google Scholar 

  • Saaty, T.L. 1980. The analytic hierarchy process. McGraw-Hill, New York, 287 pp.

    Google Scholar 

  • Schmoldt, D.L. and Peterson, D. L. 2000. Analytical group decision making in natural resources: Methodology and application. Forest Science 46: 62–75.

    Google Scholar 

  • Schmoldt, D.L., Peterson, D. L. and Silsbee, D.G. 1994. Developing inventory and monitoring programs based on multiple objectives. Environmental Management 18: 707–727.

    Article  Google Scholar 

  • Silsbee, D.G. and Peterson, D.L. 1991. Designing and implementing comprehensive long- term inventory and monitoring programs for National Park System lands. Natural Resources Report NRR-91/04. National Park Service, Denver, Colorado.

    Google Scholar 

  • Silsbee, D.G. and Peterson, D.L. 1993. Planning for implementation of resource monitoring programs. Environmental Monitoring and Assessment 26: 177–185.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2001 Springer Science+Business Media Dordrecht

About this chapter

Cite this chapter

Schmoldt, D.L., Peterson, D.L. (2001). Strategic and Tactical Planning for Managing National Park Resources. In: Schmoldt, D.L., Kangas, J., Mendoza, G.A., Pesonen, M. (eds) The Analytic Hierarchy Process in Natural Resource and Environmental Decision Making. Managing Forest Ecosystems, vol 3. Springer, Dordrecht. https://doi.org/10.1007/978-94-015-9799-9_5

Download citation

  • DOI: https://doi.org/10.1007/978-94-015-9799-9_5

  • Publisher Name: Springer, Dordrecht

  • Print ISBN: 978-90-481-5735-8

  • Online ISBN: 978-94-015-9799-9

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics