Advertisement

Research on the Risk of College Stadiums BOT Project and Countermeasures

Conference paper
Part of the Lecture Notes in Electrical Engineering book series (LNEE, volume 113)

Abstract

In this chapter, the build-operate-transfer (BOT) model in the investment and financing system of the universities in China is researched. The necessity and feasibility of applying the BOT model and the notable problems are posed, and then the risk factors in financing process are analyzed and a series of risk reduction strategies are proposed.

Keywords

BOT model University physical education Financing Risk 

References

  1. 1.
    Hwang YL (1995) Project and policy analysis of build-operate-transfer infrastructure development, Ph.D. Dissertation, Department of Civil Engineering, University of California, BerkeleyGoogle Scholar
  2. 2.
    Walker C, Smith AJ (1996) Privatized infrastructure:the build operate transfer. Thomas Telford Publications, LondonGoogle Scholar
  3. 3.
    David AK (1996) Risk modeling in energy contracts between host utilities and BOT plant investors. IEEE Trans Energy Convers 11(2):359–366Google Scholar
  4. 4.
    Finnerty J (1996) Project financing. Wiley, New YorkGoogle Scholar

Copyright information

© Springer Science+Business Media B.V. 2012

Authors and Affiliations

  1. 1.College of Physical EducationBeihua UniversityJilinChina

Personalised recommendations