Abstract
In this chapter, the build-operate-transfer (BOT) model in the investment and financing system of the universities in China is researched. The necessity and feasibility of applying the BOT model and the notable problems are posed, and then the risk factors in financing process are analyzed and a series of risk reduction strategies are proposed.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Hwang YL (1995) Project and policy analysis of build-operate-transfer infrastructure development, Ph.D. Dissertation, Department of Civil Engineering, University of California, Berkeley
Walker C, Smith AJ (1996) Privatized infrastructure:the build operate transfer. Thomas Telford Publications, London
David AK (1996) Risk modeling in energy contracts between host utilities and BOT plant investors. IEEE Trans Energy Convers 11(2):359–366
Finnerty J (1996) Project financing. Wiley, New York
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2012 Springer Science+Business Media B.V.
About this paper
Cite this paper
Hongchang, L., Hongyu, L. (2012). Research on the Risk of College Stadiums BOT Project and Countermeasures. In: Yang, Y., Ma, M. (eds) Green Communications and Networks. Lecture Notes in Electrical Engineering, vol 113. Springer, Dordrecht. https://doi.org/10.1007/978-94-007-2169-2_48
Download citation
DOI: https://doi.org/10.1007/978-94-007-2169-2_48
Published:
Publisher Name: Springer, Dordrecht
Print ISBN: 978-94-007-2168-5
Online ISBN: 978-94-007-2169-2
eBook Packages: EngineeringEngineering (R0)