Skip to main content

Just-in-Time, MRP, and Lean Supply Chains

  • Chapter
  • First Online:
Materials Management

Part of the book series: Springer Texts in Business and Economics ((STBE))

  • 3905 Accesses

Abstract

This chapter discusses very topical issues of just-in-time (JIT), materials requirement planning (MRP), and lean concepts in supply chains. Concepts of “pull-based” systems and “push-based” systems are explained. Conditions required for JIT (zero-inventory) system are explained. These are highly reliable/dependable source of supply located nearby, single vendor base, very frequent supplies in small quantities, direct supply from source to point of consumption, and 100 % supplies on time. Lean philosophy aims at reducing inventories in the entire supply chain without increasing the risk of shortages. The second major topic covered in this chapter is MRP, followed by a push-type materials planning system and computer software for discrete products with dependent (lumpy) demand. Limitations of MRP and its subsequent improvements through MRP II (manufacturing resources planning) are also briefly given.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 49.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 49.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Davenport TH (1998) Putting the enterprise into the enterprise system. Harv Bus Rev 76:121–131

    Google Scholar 

  • Peterson R, Silver EA (1981) Decision systems for inventory management and production planning. Wiley, New York

    Google Scholar 

  • Shankar R, Jaiswal S (1999) Enterprise resource planning. Galgotia, New Delhi

    Google Scholar 

  • Silver EA, Meal HC (1973) A heuristic for selecting lot size requirements for a case of a deterministic time varying demand rate and discrete opportunities for replenishment. Prod Inventory Manage 14(2):64–74

    Google Scholar 

  • Wagner HM, Whitin TM (1958) Dynamic version of the economic lot size model. Manage Sci 5:89–96

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer India

About this chapter

Cite this chapter

Vrat, P. (2014). Just-in-Time, MRP, and Lean Supply Chains. In: Materials Management. Springer Texts in Business and Economics. Springer, New Delhi. https://doi.org/10.1007/978-81-322-1970-5_9

Download citation

Publish with us

Policies and ethics