Keywords

1 Introduction

All of the nuclear power stations of TEPCO had experienced huge external events. One of which is the Niigata-ken Chuetsu-Oki earthquake in 2007 at Kashiwazaki-Kariwa Nuclear Power Station (NPS), and the other is the Great East Japan Earthquake in 2011 at Fukushima Daiichi NPS and Fukushima Daini NPS. Especially, the Fukushima Daiichi Units 1–3 experienced severe accident, since prolonged station blackout (SBO) and loss of ultimate heat sink (LUHS) were induced by the huge tsunami which was generated by the Great East Japan Earthquake. One of the lessons learned is “defense-in-depth for tsunami was insufficient.” In terms of safety enhancement of nuclear power plant from this lesson, countermeasure for each layer of defense-in-depth against tsunami is enhanced in the Kashiwazaki-Kariwa NPS. Then, we perform tsunami PRA in order to understand plant vulnerability and to check validity of deployed countermeasure against tsunami for Unit 7 (ABWR) of the Kashiwazaki-Kariwa NPS. This paper describes the evaluation result completed by applying to states before and after the implementation of the tsunami countermeasures.

2 Outline of Kashiwazaki-Kariwa Nuclear Power Station

The Kashiwazaki-Kariwa Nuclear Power Plant (see Fig. 10.1) is located in Kariwa Village and Kashiwazaki City in Niigata Prefecture facing on the coast of the Japan Sea, and seven nuclear reactors (Unit 1–5: BWR5, Unit 6, 7: ABWR, a total of 8212 MWe) are built.

Fig. 10.1
figure 1

Kashiwazaki-Kariwa NPS

The ground elevation is T.P. 5 m (Tokyo Peil: sea-level of Tokyo Bay) at the north side (Units 1–5) and T.P. 12 m at the south side (Units 5–7).

3 Tsunami PRA for Kashiwazaki-Kariwa Nuclear Power Station

In Japan, from the lesson of the Fukushima Daiichi accident, development of tsunami PRA method was accelerated immediately after the accident, and Atomic Energy Society of Japan (AESJ) issued tsunami PRA guideline in February 2012 [1]. Then, TEPCO started to perform tsunami PRA to evaluate the effectiveness of tsunami countermeasures. In the state before the implementation of tsunami countermeasures, since there is no means to prevent flooding to building and function failure of important equipment assuming generation of tsunami exceeding the 1st floor height of the building, each flooding propagation evaluation and fragility evaluation is done with a simple method, and the core damage frequency (CDF) for each accident sequence is calculated.

3.1 Tsunami Hazard Evaluation

Tsunami hazard for the Kashiwazaki-Kariwa NPS is evaluated based on the “method of probabilistic tsunami hazard analysis” [2] issued in 2009 by the Japan Society of Civil Engineers (JSCE). However, the occurrence frequency and the scale of earthquake, assuming multi-segment rupture of the faults which is the latest knowledge acquired in the 2011 off the Pacific coast of Tohoku Earthquake, are also taken into consideration.

3.1.1 Tsunami Source Model

Regarding the tsunami-induced source area, the tsunami induced by earthquake, originated by faults which exist in the area, is determined in terms of whether they have significant influence on the tsunami hazard of the Kashiwazaki-Kariwa NPS. As a result, the following areas are selected:

  1. 1.

    The fault which is considered in seismic design and is identified by geological survey, etc.

  2. 2.

    The fault which is unidentified by investigation, but indicated by an external organization (epicenter at coast of the Niigata southwest earthquake).

  3. 3.

    The east edge of Japan Sea; Kashiwazaki-Kariwa NPS is considered to be affected significantly when tsunami occurs there.

Regarding these tsunami occurrence areas, the tsunami occurrence scenario is created by setting up the magnitude range and the earthquake recurrence interval.

3.1.2 Uncertainty

Random uncertainty in a numerical computation model and epistemic uncertainty regarding some issues such as the existence of active fault and magnitude range, etc., are considered in tsunami hazard evaluation. Epistemic uncertainty is dealt with as number of branch of tsunami occurrence scenario, and given weighting to each scenario. Weights of discrete branches that represent alternative hypotheses and interpretations were determined by the JSCE guideline basically. In this evaluation, the magnitude range, earthquake occurrence probability, probability of multi-segment rupture of the faults, and probability distributions of random uncertainty are taken into consideration.

3.1.3 Hazard Curve

The annual probability of exceedance of tsunami wave height is created for each tsunami occurrence scenario defined in Sects. 11.3.1.1 and 11.3.1.2. Next, for each curve, with consideration for the weighting corresponding to each scenario, statistical processing is performed, and hazard curve is created for weighted average as arithmetic average for weighted accumulation sum as fractal curve. As mentioned above, the tsunami hazard curve (tsunami run-up area at the north side) is shown in Fig. 10.2. In evaluation of the state before the implementation of tsunami countermeasures, when tsunami exceeds height of the 1st floor of building, it is simply assumed that flooding in the building occurs and equipment function is lost, and it causes core damage. For example, in the evaluation of Unit 7, since the 1st floor height is T.P.12.3 m, when the tsunami beyond this height strikes, it is evaluated as core damage occurs.

Fig. 10.2
figure 2

Tsunami hazard curve

3.2 Tsunami Fragility Evaluation

Regarding influence of tsunami on equipment, damage by flooding and by tsunami wave force is considered. Regarding equipment on yard and door on outer wall of the buildings such as yard tank, yard watertight door, etc., the failure probability against tsunami wave force is set by flooding depth based on tsunami run-up analysis result. Regarding equipment and door inside building, the damage probability is set by flooding propagation analysis result for building. Regarding tsunami run-up analysis, it is performed for multi-case of tsunami height. For each case, fragility curve is evaluated from the equipment damage probability with consideration for the uncertainty in the flooding depth of the installation location for each equipment. The main assumptions in the fragility evaluation are shown below:

  1. 1.

    Embankment, tidal wall

    When tsunami exceeds the height of the embankment or tidal wall, these failures are assumed.

  2. 2.

    Watertight door, general door

    Regarding protection doors installed on building outer wall, fragility evaluation is conservatively performed with consideration for tsunami wave force.

  3. 3.

    Yard tanks (light oil tank, pure water storage tank)

    Since these tanks are on the ground, damage evaluation by tsunami wave force is performed, but evaluation for flooding and function affected by water level by submersion is also performed.

  4. 4.

    Fire protection system piping

    Fracture evaluation is performed for bending load of piping changed by tsunami wave force. Branch piping which has high failure possibility is also taken into consideration.

  5. 5.

    Equipment in building (reactor core isolation cooling system (RCIC), power panel, etc.)

    Flooding propagation evaluation in building is performed, and when the concerned equipment and required support system are inundated, the function failures are assumed.

However, in evaluation of the state before the implementation of tsunami countermeasures, fragility evaluation with consideration for uncertainty is not performed, but method that the events induced by the tsunami of a certain height are deterministically evaluated is adopted.

3.3 Accident Scenario Identification

3.3.1 The State Before the Implementation of Tsunami Countermeasures

At the state before the implementation of tsunami countermeasures, it is assumed accident scenarios considering flooding according to the tsunami wave height. In addition, if the tsunami height is below the site level (T.P. 12 m), it is assumed that inundation starts via maintenance hatch (T.P. 3.5 m) in the heat exchanger area in the turbine building when tsunami height exceeds T.P. 3.5 m. Also, it is conservatively assumed that all the buildings connected to turbine building are flooded to the tsunami height.

  1. 0.

    Tsunami height between T.P. 4.2 m and T.P. 4.8 m

    The support system (e.g., reactor cooling water system (RCW) pumps, reactor sea water system (RSW) pumps) is located in basement 1st floor of turbine building (T/B). When tsunami height exceeds T.P. 4.2 m, the support system is flooded, and it causes LUHS by the function failure. In addition, non-safety-related metal-clad switch gear (M/C) in basement 2nd floor of T/B is also flooded.

  2. 1.

    Tsunami height between T.P. 4.8 m and T.P. 6.5 m

    Emergency M/C in basement floor of reactor building (R/B) is flooded and lost its function. It causes SBO by the function failure of emergency M/C and non-safety-related M/C, because it cannot be powered by off-site power and emergency diesel generators (D/Gs).

  3. 2.

    Tsunami height between T.P. 6.5 m and T.P. 12.3 m

    DC power panel in the basement floor of control building (C/B) is flooded and loses its function. It causes loss of DC power.

  4. 3.

    Tsunami height exceeding T.P. 12.3 m

    Tsunami runs up to the site level, low-voltage start-up transformer located at the site level is flooded and loses its function, and inundation into the main buildings occurs via entrance of each building.

3.3.2 The State After the Implementation of Tsunami Measures

Using the results of tsunami fragility analysis as a reference, initiating events which are induced by tsunami are adopted and accident scenario analysis is conducted.

The extracted initiating events are shown below:

  1. 1.

    Loss of off-site power (LOOP)

    • Flooding of low-voltage start-up transformer

  2. 2.

    Loss of function of emergency D/G

    • Flooding of emergency D/G(A,B,C) by inundation of R/B

    • Fuel transport failure by damage of light oil tank

    • Fuel transport failure by damage of fuel transport pump

    • Operation failure of emergency D/Gs operation failure by loss of support system function by T/B flooding

    • Flooding of emergency power panel room in R/B

  3. 3.

    Loss of ultimate heat sink

    • Loss of support system function by T/B flooding

    • Loss of support system function by D/G failure (in case of LOOP)

  4. 4.

    Loss of instrumentation and control system function

    • Flooding of main control room (MCR) in C/B

    • Flooding of DC power panel in C/B

Plant walkdown in R/B, T/B, and yard is implemented by analysts and designers to confirm the result of fragility analysis and assumed accident scenario. As a result, validity of the fragility and scenario is checked.

3.4 Accident Sequence Evaluation

3.4.1 The State Before the Implementation of Tsunami Countermeasures

Accident scenario changes according to tsunami height. So, initiating events and credited mitigation systems are changed as well.

  1. 1.

    Tsunami height between T.P. 4.2 m and T.P. 4.8 m

    Initiating event is set as LUHS. In identified accident scenario, the relief valve function of SRV and RCIC are credited as mitigation systems. Event tree is shown in Fig. 10.3. CDF for this tsunami height is calculated as 8.8E-5(/RY), and dominant sequence is TQUV (transient with loss of all ECCS injections).

    Fig. 10.3
    figure 3

    Event tree (tsunami height T.P. 4.2 m–4.8 m)

  2. 2.

    Tsunami height between T.P. 4.8 m and T.P. 6.5 m

    Initiating event is set as LUHS and SBO. Credited mitigation system is the same as (1). Event tree is shown in Fig. 10.4. CDF for this tsunami height is calculated as 1.0E-4(/RY) and dominant sequence is TQUV.

    Fig. 10.4
    figure 4

    Event tree (tsunami height T.P. 4.8 m–6.5 m)

  3. 3.

    Tsunami height exceeding T.P. 6.5 m

    Initiating event is set as LUHS, SBO, and loss of DC power. No credited mitigation system is set because it is assumed loss of DC power. Event tree is shown in Fig. 10.5. CDF for this tsunami height is calculated as 2.5E-5 (/RY), and dominant sequence is TBD (transient with loss of all AC and DC powers).

    Fig. 10.5
    figure 5

    Event tree (tsunami height exceeding T.P. 6.5 m)

Tsunami PRA results at the state before the implementation of countermeasures is shown in Fig. 10.6. Total CDF is calculated as 2.1E-4(/RY) in average value. As for accident sequence rate, TQUV is dominant sequence accounting for 89 percentages.

Fig. 10.6
figure 6

Contribution of each accident sequences for CDF in tsunami PRA (the state before the implementation of tsunami countermeasures)

3.4.2 The State After the Implementation of Tsunami Countermeasures

Based on the result of tsunami fragility analysis, in the accident sequence analysis, failure rate which is relevant to initiating events or equipment relevant to credited mitigation system is calculated, and combination of tsunami height and damaged equipment is considered.

Regarding the accident sequence analysis, tsunami initiating hierarchy event tree is constructed. In this event tree, yard equipment whose failure is directly connected to the initiating event is set as heading. The hierarchy event tree is shown in Fig. 10.7. In event tree for each initiating event which is expanded from the hierarchy event tree, yard equipment which is not considered as heading is set as mitigation systems.

Fig. 10.7
figure 7

Hierarchy event tree

The outline of accident sequence analysis is described below:

  1. 1.

    Tsunami height between T.P. 15 m and T.P. 17 m

    Because, as shown by the fragility analysis result, the watertight doors of each building are not broken by tsunami of this height, inundation into the buildings does not occur, but the fuel transport pumps on yard are destroyed by tsunami. In this state, random failure of temporary oil transport pump which is installed thereafter is assumed. Because of this, all emergency D/Gs lose their function, and it causes the SBO.

  2. 2.

    Tsunami height between T.P. 17 m and T.P. 18 m

    Because, as shown by the fragility analysis result, the watertight doors of T/B and R/B are broken by tsunami of this height, inundation into the T/B and R/B occurs. Inundation into the T/B causes the flooding of support systems (e.g., RCW and RSW pumps) and the loss of its function, and then LUHS occurs. Also, inundation into the R/B causes the flooding of RCIC control panel and the loss of RCIC function. Then all of the water injection function failure is occurred.

  3. 3.

    Tsunami height exceeding T.P. 18 m

    Because, as shown by the fragility analysis result, the watertight door of C/B is broken by tsunami of this height, inundation into the C/B occurs, and it causes the loss of DC power (TBD).

Tsunami PRA result at the state after the implementation of countermeasures is shown in Fig. 10.8. Total CDF is calculated as 1.0E-7(/RY) in average value. As for accident sequence rate, TBD is dominant sequence accounting for 74 percentages in total CDF.

Fig. 10.8
figure 8

Contribution of each accident sequences for CDF in tsunami PRA (the state after the implementation of tsunami countermeasures)

4 Effectiveness Evaluation About the Measure Taken in the Kashiwazaki-Kariwa Nuclear Power Plant

The validity of the measures against tsunami and power supply reflecting the lessons learned from the Fukushima Daiichi NPS accident will be evaluated by using the tsunami PRA. Here, the validity for the implemented safety measures is qualitatively discussed from the view of TQUV and TBD which are the important accident sequences determined prior to the implementation of additional safety countermeasures. Regarding TQUV, probability of LUHS and possibility of inoperability of RCIC by submersion will decrease due to installation of embankment, tidal wall, and watertight doors for important equipment rooms such as RCIC room and modification for maintenance hatch in T/B. Furthermore, even though all low-pressure water injection systems are lost by tsunami exceeding the embankment height, water injection can be done by fire engines located at high elevations. Therefore, in the state after the implementation of the tsunami countermeasures, it can be presumed that the occurrence probability of TQUV is reduced substantially. As for TBD, probability of LOOP and inoperable possibility of DC power by submersion will also decrease due to installation of embankment and watertight doors of important equipment rooms. In addition, the enhancement of DC power supplies is implemented for storage battery extension at higher floor in the reactor building, additional established storage battery, installation of the small generator, and maintenance of the DC power supply means. Accordingly, it is presumed that the possibility of loss of DC power decreases. Therefore, the present measures can be presumed as being appropriate against the important accident sequences extracted.

5 Conclusion

Tsunami PRA studies for Unit 7 of Kashiwazaki-Kariwa NPS was conducted, and the dominant accident scenarios that may result in core damage due to flooding were identified. The important accident sequences were evaluated as TQUV and TBD at the state before the implementation of countermeasures and CDF calculated as 2.1E-4 (/RY). This information supports qualitative assessment of the countermeasures that have been and will be implemented which indicates that these accident sequence probabilities will be decreased. Hence, the tsunami PRA was performed with the state after the implementation of tsunami countermeasures and CDF is calculated as 1.0E-7(/RY). By comparing these two CDFs, the effectiveness of the tsunami countermeasures which are implemented in the Kashiwazaki-Kariwa NPS is confirmed.

In this evaluation, there are some conservative assumptions, and total CDF is evaluated conservatively. However, for the purpose of safety enhancement, PRA should be implemented with more realistic method not to hide important sequences and equipment. With an emphasis on a sequence whose CDF is large, if the evaluation is impractical, there is a possibility that determination of safety measures will not be proper.

For example, countermeasures undetermined at that time of the PRA model design, such as waterproof treatment against internal flooding and drainage pumps, are not considered in the present evaluation. As a result, if outside watertight doors are broken due to wave pressure, the equipment in buildings is flooded and damaged according to the flooding depth. For the next step, more detail flooding propagation analyses in buildings with information of additional countermeasures are needed. The insights of inner flooding analysis will be also available. TEPCO will try to improve tsunami PRA continuously and enhance safety of the Kashiwazaki-Kariwa NPS using such results.