Abstract
During the last five years many institutes worldwide produced and tested the individual components for the silicon strip detector. Starting from the main ingredients – sensors, front-end electronics, module frames etc. – the objects being built and under test became more and more complex. Finally after careful shipment of all pre-assembled and tested subdetectors the full silicon strip tracker was assembled and commissioned at the tracker test facility TIF at CERN. In December 2007 the entire object was installed inside CMS in its final position. Final cabling and testing was carried out and finished in spring 2008.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Rights and permissions
Copyright information
© 2010 Vieweg+Teubner | GWV Fachverlage GmbH
About this chapter
Cite this chapter
Pooth, O. (2010). Detector Production and Commissioning. In: The CMS Silicon Strip Tracker. Vieweg+Teubner. https://doi.org/10.1007/978-3-8348-9639-1_4
Download citation
DOI: https://doi.org/10.1007/978-3-8348-9639-1_4
Publisher Name: Vieweg+Teubner
Print ISBN: 978-3-8348-1003-8
Online ISBN: 978-3-8348-9639-1
eBook Packages: Physics and AstronomyPhysics and Astronomy (R0)