Skip to main content
  • 1485 Accesses

Once all the background information has been clarified and the commencement date approaches, the contractor takes possession of the site. A once desolate piece of land comes to life as numerous tradespeople move in and set to work. The type and the scale of work will determine the number of trades involved, the volume of noise to be expected and the duration of the project. For neighbours and surrounding properties, a very wearing period commences. A construction site sign informs neighbours and passers-by of the future development and all the companies involved.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 29.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2010 Vieweg+Teubner Verlag | Springer Fachmedien Wiesbaden GmbH

About this chapter

Cite this chapter

Heidenreich, S. (2010). Construction. In: Englisch für Architekten und Bauingenieure – English for Architects and Civil Engineers. Vieweg+Teubner. https://doi.org/10.1007/978-3-8348-9621-6_12

Download citation

Publish with us

Policies and ethics