Abstract
The project business is characterized by one-time product service offerings which clearly distinguish themselves from product business with respect to complexity, size and individuality. Due to long production and processing periods, which often amount to a number of years, planning risks arise as a result, which make an ex ante determination of the price difficult. However, especially for project tenders, the supplier must perform an estimate of the project costs incurred which is as accurate as possible in order to on the one hand have a chance against its competitive bidders during the submission of tender and on the other hand to ensure concluding the project in a cost-covering or profitable way.
The decision about the price level thus requires a careful project calculation and systematic revenue planning in the project business. Moreover the calculation risks, which are e.g. caused by wage and material price fluctuations across the project duration, must be mitigated to a great extent. This chapter shows calculation methods and explains them using practical calculation samples. The calculation methods (e.g. kilo cost methods or detail calculation) are used in various project phases and vary in terms of their calculation effort and the reliability of the results. Procedures and contractual agreements such as price reservations or price adjustment clauses for the minimization of calculation risks are also explained and described by reference to a practical example.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Literature
Alznauer, T., & Krafft, M. (2004). Submissionen. In K. Backhaus & M. Voeth (Eds.), Handbuch Industriegütermarketing. Strategien—Instrumente—Anwendungen (pp. 1057–1078). Wiesbaden: Gabler.
Backhaus, K. (1979a). Preisgleitklauseln als risikopolitisches Instrument bei langfristigen Fertigungs- und Absatzprozessen. Schmalenbachs Zeitschrift für betriebswirtschaftliche Forschung, 31, 3–10.
Backhaus, K. (1979b). Preisgleitklauseln aus beschaffungsorientierter Sicht. Beschaffung aktuell, 12, 41–44.
Backhaus, K. (1980). Auftragsplanung im industriellen Anlagengeschäft. Stuttgart: Poeschel.
Backhaus, K., Erichson, B., Plinke, W., & Weiber, R. (2011). Multivariate Analysemethoden. Eine anwendungsorientierte Einführung (13th ed.). Berlin: Springer.
Backhaus, K., & Voeth, M. (2010). Industriegütermarketing (9th ed.). München: Vahlen.
Bhattacharyya, S. C., & Dey, P. K. (2007). Managing risk in a large rural electrification programme in India. Impact Assessment and Project Appraisal, 25(March), 15–26.
Dey, P. K., Tabucanon, M. T., & Ogunlana, S. (1994). Risk management planning for project control through risk analysis: A petroleum pipeline-laying project. International Journal of Project Management, 12(1), 23–33.
Edelman, F. (1965). Art and science of competitive bidding. Harvard Business Review, 43(1), 53–56.
Engelhardt, W. H. (1977). Grundlagen des Anlagen-Marketing. In W. H. Engelhardt & G. Laßmann (Eds.), Anlagen Marketing. Sonderheft 7 der Zeitschrift für betriebswirtschaftliche Forschung 9–37.
Engelhardt, W. H., & Günter, B. (1981). Investitionsgütermarketing. Stuttgart: Kohlhammer.
Eversheim, W., Fischer, W., & Minolla, W. (1977). Angebotskalkulation mit Kostenfunktionen in der Einzel- und Kleinserienfertigung. Berlin: Beuth.
Feuerbaum, E. (1979). Controlling in einem projektorientierten Unternehmen. In D. Solaro, H. D. Bürgel, E. Feuerbaum, J. Funk, W. F. Gerke, H. R. Kunkowsky, et al. (Eds.), Projektcontrolling (pp. 1–47). Stuttgart: Poeschel.
Feuerbaum, E., & Witte, K. (1977). Steuerung der Auftragsabwicklung im Großanlagenbau durch Bildschirm-Dialogverkehr. IBM-Nachrichten, 27, 153–160.
Floricel, S., & Miller, R. (2001). Strategizing for anticipated risks and turbulence in large-scale engineering projects. International Journal of Project Management, 19, 445–455.
Gaismayer, J. (2011). Verminderung von Hold-up-Risiken in Nachverhandlungssituationen. Eine empirische Analyse aus der Perspektive von Logistik-Dienstleistern am Beispiel des Kontraktlogistik-Geschäfts. Wiesbaden: Springer Gabler.
Gaßmann, J. (2009). Bilanzielle Abbildung von Preisanpassungsklauseln. Im Rahmen von Unterneh-menszusammenschlüssen nach IFRS 3 (rev. 2008). Hamburg: Kovac.
Gemünden, H. G. (1980). Effiziente Interaktionsstrategien im Investitionsgütermarketing. Marketing—Zeitschrift für Forschung und Praxis, 2(1), 21–32.
Gemünden, H. G. (1981). Innovationsmarketing. Interaktionsbeziehungen zwischen Hersteller und Verwender inno-vativer Investitionsgüter. Tübingen: Mohr.
Girmscheid, G. (2010). Angebots- und Ausführungsmanagement—Leitfaden für Bauunternehmen. Erfolgsorien-tierte Unternehmensführung vom Angebot bis zur Ausführung (2nd ed.). Berlin: Springer.
Grabowski, H., & Kambartel, K. H. (1978). Rationelle Angebotsbearbeitung im Unternehmen mit Auftragsfertigung. Essen: Girardet.
Günter, B. (1979). Das Marketing von Großanlagen. Strategieprobleme des Systems Selling. Berlin: Duncker & Humblot.
Herbst, U. (2007). Präferenzmessung in industriellen Verhandlungen. Wiesbaden: Gabler.
Homburg, C. (2012). Marketingmanagement. Strategie—Instrumente—Umsetzung—Unternehmensführung (4th ed.). Wiesbaden: Gabler.
Verein Deutscher Ingenieure. (Ed.) (1983). Angebotserstellung in der Investitionsgüterindustrie. Düsseldorf: VDI.
Ioanno, P. G., Asce, M., & Awwad, R. E. (2010). Below-average bidding method. Journal of Construction Engineering and Management, 136, 936–947.
Kambartel, K. H. (1973). Systematische Angebotsplanung in Unternehmen der Auftragsfertigung. Dissertation, Aachen.
Kirsch, W. (1978). Die Handhabung von Entscheidungsproblemen. München: Kirsch.
Kirsch, W., Lutschewitz, H., & Kutschker, M. (1977). Ansätze und Entwicklungstendenzen im Investitionsgütermarketing. München: Schäffer-Poeschel.
Kolb, J. (1978). Industrielle Erlösrechnung. Grundlagen und Anwendung. Wiesbaden: Gabler.
Krause, F.-L., Kind, C., & Müller, C. (2005). Prozessoptimierung in der Angebotserstellung. Wt Werkstattstechnik online, 95(1/2), 7–10.
Kuß, A. (1977). Competitive-Bidding-Modelle. Zeitschrift für betriebswirschaftliche Forschung, 29(4), 63–70.
Laßmann, G. (1979). Erlösrechnung und Erlösanalyse bei Großserien- und Sortenfertigung. Schmalenbachs Zeitschrift für betriebswirtschaftliche Forschung, 31(135–142), 153–162.
Oo, B. L., Lo, H.-P., & Lim, B. T.-H. (2012). The effect of bidding success in construction bidding. Engineering, Construction and Architectural Management, 19(1), 25–39.
Opitz, H., Brankamp, K., & Kambartel, K. H. (1971). Systematisierung der Angebotsplanung im Rahmen des integrierten Informationsflusses der Unternehmen. Opladen: Westdeutscher Verlag.
Oxenfeldt, A. R. (1966). Executive action in marketing. Belmont, CA: Wadsworth.
Oxenfeldt, A. R. (1977). The computation of costs for price decisions. Industrial Marketing Management, 6(2), 83–90.
Oxenfeldt, A. R. (1979). The differential method of pricing. European Journal of Marketing, 13(4), 199–212.
Plinke, W. (1985). Erlösplanung im industriellen Anlagengeschäft. Wiesbaden: Gabler.
Plinke, W., & Rese, M. (2000). Analyse der Erfolgsquellen. In M. Kleinaltenkamp & W. Plinke (Eds.), Technischer Vertrieb—Grundlagen des Business-to-Business Marketing (2nd ed., pp. 691–760). Berlin: Springer.
Plinke, W., & Rese, M. (2006). Industrielle Kostenrechnung (7th ed.). Berlin: Springer.
Plötner, O., Sieben, B., & Kummer, T.-F. (2010). Kosten- und Erlösrechnung. Anschaulich, kompakt, praxisnah (2nd ed.). Berlin: Springer.
Rese, M., & Herter, V. (2004). Preise und Kosten—Preisbeurteilung im Industriegüterbereich. In K. Backhaus & M. Voeth (Eds.), Handbuch Industriegütermarketing. Strategien—Instrumente—Anwendungen (pp. 969–988). Wiesbaden: Gabler.
Reul, A. (2007). Aufhebung der Genehmigungspflicht bei Wertsicherungsklauseln—Das neue Preisklauselgesetz (PreisklauselG). Mitteilungen des Bayerischen Notarvereins, der Notarkasse und der Landesnotarkammer Bayern (MittBayNot) 6/2007.
Rimpau, C. (2011). Wissensbasierte Risikobewertung in der Angebotskalkulation für hochgradig individualisierte Produkte. Munich: Utz.
Sandstede, C. (2010). Verhandlungen unter Unsicherheit auf Industriegütermärkten. Wiesbaden: Gabler.
Spiegel-Verlag. (1972). Entscheidungsprozesse und Informationsverhalten in der Industrie. Hamburg: Spiegel-Verlag.
Statistisches Bundesamt. (2012). Erzeugerpreisindizes gewerblicher Produkte: Deutschland, Monate, Güterverzeichnis (GP2009 2-5-Steller Hierarchie).
VDMA. (1971). Preisvorbehaltsklauseln in rechtlicher Sicht (Vol. Sonderveröffentlichung Nr. 2/71). Frankfurt a.M.: Abteilung Recht und Wettbewerbsordnung des VDMA.
Weiber, R., & Kleinaltenkamp, M. (2012). Business- und Dienstleistungsmarketing. Stuttgart: Kohlhammer.
Wellensiek, M. (2007). Präzision bereits in der Planung—Featurebasiertes Kostenmanagement in frühen Phasen der Produktgestaltung. Tools—Informationen der Aachener Produktionstechniker, 14(1), 10–11.
Witte, H. (2005). Die Bedeutung der Preisgleitklausel für Verträge mit Zulieferern in der Logistikkette. Europa Regionum, 8, 25–36.
Yang, J., & Mattfeld, D. C. (2007). Entscheidungsunterstützung für die Ressourcenallokation im internationalen Großanlagenbau. In H.-O. Günther, D. C. Mattfeld, & L. Suh (Eds.), Management logistischer Netzwerke. Entscheidungsunterstützung, Informationssysteme und OR-Tools (pp. 137–155). Heidelberg: Physica.
Yosha, R. (2012). Make it not go wrong. Risk management can keep projects from fulfilling Murphy’s Law. Industrial Engineer, 44(6), 36–42.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Exercises
Exercises
-
1.
What is a planned revenue? In which context are planned revenues spoken of?
-
2.
Which relation does the order price bear to the planned revenue?
-
3.
Which order price calculation methods in the industrial plant business do you know? How are these methods distinguished?
-
4.
How do you calculate the quality of a kilo cost estimate?
-
5.
Which relation do the customer benefit and the upper price limit bear to each other?
-
6.
How can an upper price limit be ascertained within the scope of planned revenue?
-
7.
How is the process of competitive bidding characterized? Describe a process for the systematic determination of prices for competitive bidding situations.
-
8.
To what extent is the activity level important for the determination of lowest price limits?
-
9.
Which dangers arise for pricing policy due to misunderstandings of the calculation?
-
10.
Where does the so-called lowest price limit lie in terms of economic sales?
-
11.
To what extent is a price adjustment clause suitable as an instrument for the reduction of calculation risks? Which aspects must be taken into consideration for the configuration of such a clause?
Rights and permissions
Copyright information
© 2016 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Plinke, W., Claßen, M. (2016). Pricing and Revenue Planning in the Project Business. In: Kleinaltenkamp, M., Plinke, W., Geiger, I. (eds) Business Project Management and Marketing. Springer Texts in Business and Economics. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-48507-1_3
Download citation
DOI: https://doi.org/10.1007/978-3-662-48507-1_3
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-662-48506-4
Online ISBN: 978-3-662-48507-1
eBook Packages: Business and ManagementBusiness and Management (R0)