Skip to main content

Autonomous Planning Agents for Real-Time Control

  • Conference paper
  • 142 Accesses

Part of the book series: NATO ASI Series ((NATO ASI F,volume 101))

Abstract

In this paper we describe a novel architecture for real-time control of manufacturing, based on an earlier scheduling system, namely ReDS. The new system, ReDS2, has many differences from its predecessor, the most noteworthy being its recursive architecture composed of self-reliant Planning Agents. It allows an arbitrary number of control layers of autonomous and independent modules and a broadcast architecture for communication. The proposed architecture has a number of advantages over the conventional approaches and it is intended to be a small step in the direction of developing a generic and unified approach for planning, scheduling and control of production in manufacturing organizations.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   169.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD   219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Aggarwal, S. C., “MRP, JIT, OPT, FMS”, Harvard Business Review, Sept.-Oct., 1985.

    Google Scholar 

  2. Baker, K. R., “Introduction to Sequencing and Scheduling”, John Wiley und Sons, Inc. 1974.

    Google Scholar 

  3. Boesenberg, W., “Current Status of Integrated Circuit Factory Automation, especially Related to Diffusion Furnaces”. Siemens RTL, Technical Report # RTL-85-TR-044, 1985.

    Google Scholar 

  4. Brooks, R. “A Robust Layered Control System For A Mobile Robot;” IEEE J. of Robotics and Automation, Vol RA-2, No. 1, March 1986.

    Google Scholar 

  5. Conway, R. W., et. al., Theory of Scheduling, Addison Wesley Publishing Co., Inc. 1967.

    Google Scholar 

  6. Fox, M.S., et. al., “Job-Shop Scheduling: An Investigation in Constraint-Directed Reasoning”, Proc. AAAI, 1982.

    Google Scholar 

  7. Fox, M.S., “Constraint-Directed Search: A Case Study of Job-Shop Scheduling”, Carnegie-Mellon University CMU-RI-TR-83–22, 1983

    Google Scholar 

  8. Fox, M. S. and Smith, S. F., “ISIS - A knowledge-based System for Factory Scheduling;” Expert Systems Vol. 1, No. 1, 1984.

    Google Scholar 

  9. Grant, T. J., “Lessons for OR from AI; A Scheduling Case Study”, Journal of the Operational Research Society, Vol. 37, No. 1, 1986, pp. 41–57.

    Google Scholar 

  10. Hadavi, K., “Dynamic Schedulinlg for FMS”, AUTOFACT 85 PRDC. Detroit 1985.

    Google Scholar 

  11. Hadavi, K. M. Shahraray, K. Voigt; “An Environment for Planning, Scheduling and Control of Factories”, J. of Manufacturing, Vol 9, 1990.

    Google Scholar 

  12. Hadavi, K. M. Shahraray; “In Time Control of Factory Production via Global Feedback,”Submitted for Publication Journal of Manufacturing and Operations Management

    Google Scholar 

  13. Hadavi, K. “ReDS-A Real Time Scheduling System” AAAI-90 Manufacturing Planning and Control Workshop, Proc of AAAI, Boston 1990.

    Google Scholar 

  14. Hadavi, K. “ReDS-Statistician Overview;” Siemens Corporate Research Internal Memo, 755 College Rd, Princeton, NJ 08540, 1990.

    Google Scholar 

  15. Hadavi, K. “Problem Solving with Moving Objective;” SCR memo 1991 (To be submitted for Publication).

    Google Scholar 

  16. Hadavi, K. “An Integrated Real-Time Management System;” Siemens Corporate Research Internal Memo, 755 College Rd, Princeton, NJ 08540, 1990.

    Google Scholar 

  17. Kanet, J., H. Adelsberger: “Expert Systems in Production Scheduling;” European J. of OR, Vol. 29, pp 51–59, 1987.

    Google Scholar 

  18. Kusiak, A.: “Designing Expert Systems for Scheduling of Automayed Manufacturing;” lE, pp. 42–46, july 1987.

    Google Scholar 

  19. Mertens, P. et al: “Expert Systems in Production Management: An Assessment;” J. of Operations Management, Vol. 6, No 4, pp. 393–403, 1986.

    Google Scholar 

  20. Smith, S. and P. Ow: “ The Use of Multiple Problem Decomposition in Time-Constrained Planning Tasks;” UCAI 85, pp. 1013–1015, August 1985.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 1993 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Hadavi, K.C. (1993). Autonomous Planning Agents for Real-Time Control. In: Holsapple, C.W., Whinston, A.B. (eds) Recent Developments in Decision Support Systems. NATO ASI Series, vol 101. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-02952-7_21

Download citation

  • DOI: https://doi.org/10.1007/978-3-662-02952-7_21

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-08147-7

  • Online ISBN: 978-3-662-02952-7

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics