Skip to main content

Measuring First-Time-Right Procurement

  • Chapter
  • First Online:
First-Time-Right Procurement
  • 1289 Accesses

Abstract

This chapter focuses on developing an FTRP-based measuring system. The first step is to briefly elaborate the theoretical basis underlying performance measurement. Requirements that indicators must satisfy for First-Time-Right procurement measurement (FTRPM) are subsequently defined. Finally, indicators should be developed enabling the FTRP approach to replace monetary purchasing savings in accordance with SCM objectives. The chapter concludes by summarizing and reflecting upon the insights attained.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Oliver Münch .

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer Fachmedien Wiesbaden

About this chapter

Cite this chapter

Münch, O. (2015). Measuring First-Time-Right Procurement. In: First-Time-Right Procurement. Springer Gabler, Wiesbaden. https://doi.org/10.1007/978-3-658-08620-6_6

Download citation

Publish with us

Policies and ethics