Skip to main content

Scheduling of CCs and HSMs in the steel industry

  • Chapter
  • First Online:
Integrated Scheduling of Continuous Casters and Hot Strip Mills

Part of the book series: Produktion und Logistik ((PL))

  • 479 Accesses

Abstract

This work focuses on two production steps continuous caster (CC) and hot strip mill (HSM), as illustrated in figure 17. Interestingly, production scheduling can have a major impact on energy efficiency at these production steps.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Imke Mattik .

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer Fachmedien Wiesbaden

About this chapter

Cite this chapter

Mattik, I. (2014). Scheduling of CCs and HSMs in the steel industry. In: Integrated Scheduling of Continuous Casters and Hot Strip Mills. Produktion und Logistik. Springer Gabler, Wiesbaden. https://doi.org/10.1007/978-3-658-03775-8_4

Download citation

Publish with us

Policies and ethics