Noise mitigation systems and low-noise installation technologies

  • Chapter
  • First Online:
Ecological Research at the Offshore Windfarm alpha ventus

Abstract

In line with Germany’s national renewable energy targets, thousands of wind turbines are going to be installed in the North Sea and the Baltic Sea in the coming decades. This expansion of offshore wind power is obliged to take place in a sustainable and environmentally sound manner. To mitigate environmental impacts associated with the installation process for offshore wind turbines, extensive research and development (R&D) effort has gone into the development, full-scale testing and evaluation of noise mitigation measures and low-noise foundation installation technologies. The article focuses on relevant primary and secondary noise mitigation techniques (adjustment of piling energy, impulse prolongation, bubble curtains, hydro sound dampers, casings, cofferdams) and on selected low-noise installation technologies (vibro piling, drilling, gravity based foundations, suction buckets).

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 44.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Literature

  • Bellmann M, Gündert S, Remmers P (2014). Offshore Messkampagne 1 (OMK 1) für das Projekt BORA im Windpark BARD Offshore 1. Report for the BMU funded research project “Predicting Underwater Noise due to Offshore Pile Driving (BORA)”, project ref. no. 0325421 A. Oldenburg, February 2014, 141 pp.

    Google Scholar 

  • Betke K & Matuschek R (2011). Messungen von Unterwasserschall beim Bau der Windenergieanlagen im Offshore-Testfeld alpha ventus. Abschlussbericht zum Monitoring nach StUK3 in der Bauphase. Oldenburg, May 2011, 48 pp.

    Google Scholar 

  • Beyer M & Brunner WG (2006). Drilling Monopiles at Barrow Offshore Windfarm, UK. Tiefbau 6/2006, p. 346–350.

    Google Scholar 

  • Caltrans (2001). Marine Mammal Impact Assessment for the San Francisco – Pile Installation Demonstration Project. Report for Oakland Bay Bridge East Span Seismic Safety Project. California Department of Transportation (Caltrans). Contract No. 04A0148, 04-ALA-80-0.0/0.5, August 2001, 49 pp.

    Google Scholar 

  • de Neef L, Middendorp P, Bakker J (2013). Installation of Monopiles by Vibrohammers for the Riffgat Project. In: Proceedings Pfahlsymposium 2013, Braunschweig, 21 February 2013, 14 pp.

    Google Scholar 

  • Diederichs A, Pehlke H, Bellmann M, Gerke P, Oldeland J, Grunau C, Witte S, Rose A, Nehls G (2014). Entwicklung und Erprobung des Großen Blasenschleiers zur Minderung der Hydroschallemissionen bei Offshore-Rammarbeiten. Final report for the BMU funded research project “Hydroschall-OFF BWII”, project ref. no. 0325309 A/B/C. Husum, March 2014, 240 pp.

    Google Scholar 

  • Elmer KH, Betke K, Neumann T (2007a). Standardverfahren zur Ermittlung und Bewertung der Belastung der Meeresumwelt durch die Schallimmission von Offshore-Windenergieanlagen. Final report for the BMU funded research project “Schall II”, project ref. no. 0329947. Hanover, March 2007, 129 pp.

    Google Scholar 

  • Elmer KH, Betke K, Neumann T (2007b). Standardverfahren zur Ermittlung und Bewertung der Belastung der Meeresumwelt durch die Schallimmission von Offshore-Windenergieanlagen – Untersuchung von Schallminderungsmaßnahmen an FINO 2. Final report for the correspondent BMU funded research project, project ref. no. 0329947 A. Hanover, July 2007, 28 pp.

    Google Scholar 

  • Elmer KH, Gerasch WJ, Neumann T, Gabriel J, Betke K, Schultz-von Glahn M (2007c). Measurement and Reduction of Offshore Wind Turbine Construction Noise. DEWI Magazine No. 30. Wilhelmshaven, February 2007, p 33–38.

    Google Scholar 

  • Fischer J, Sychla H, Bakker J, de Neef L, Stahlmann J (2013). A comparison between impact driven and vibratory driven steel piles in the German North Sea. In: Proceedings Conference on Maritime Energy (COME), Hamburg, 21–22 May 2013.

    Google Scholar 

  • GlobalTech1 (2013). Erfolgreiche Installation der parkinternen Umspannstation. Press release 09.05.2013. http://www.globaltechone.de/presse/aktuelles/erfolgreiche-installation-der-parkinternen-umspannstation-40/

    Google Scholar 

  • Grießmann T, Rustemeier J, Betke K, Gabriel J, Neumann T, Nehls G, Brandt M, Diederichs A, Bachmann J (2010). Erforschung und Anwendung von Schallminimierungsmaßnahmen beim Rammen des FINO3-Monopiles. Final report for the BMU funded research project “Schall FINO3”, project ref. no. 0325023 A/0325077. Hanover 2010, 144 pp.

    Google Scholar 

  • Ibsen LB, Liingaard M, Nielsen SA (2005). Bucket foundation, a status. In: Proceedings of Copenhagen Offshore Wind 2005. Copenhagen, 26–28 October 2005.

    Google Scholar 

  • Jung B (2013). Marktreife Weiterentwicklung der VSM-Technologie für die Erstellung von Fundamenten für Offshore-Windenergieanlagen. Final report for the correspondent BMU funded research project, project ref. no. 0325233. Schwanau, March 2013, 32 pp.

    Google Scholar 

  • Koschinski S & Lüdemann K (2013). Entwicklung schallmindernder Maßnahmen beim Bau von Offshore-Windenergieanlagen. Studie im Auftrag des Bundesamtes für Naturschutz (BfN). Nehmten/Hamburg, February 2013, 96 pp.

    Google Scholar 

  • Kringelum JV (2013, pers. comm.). Results of Anholt noise mitigation project by DONG energy. To be presented at EWEA Offshore 2013 conference.

    Google Scholar 

  • Offshore Engineer 2005: MOAB scores North Sea first. Offshore Engineer, Nov. 2005, p. 25–28.

    Google Scholar 

  • Remmers P & Bellmann M (2013). Untersuchung und Erprobung von Hydroschalldämpfern (HSD) zur Minderung von Unterwasserschall bei Rammarbeiten für Gründungen von Offshore-Windenergieanlagen. Report for the BMU funded research project “HSD”, project ref. no. 0325365. Oldenburg, June 2013, 55 pp.

    Google Scholar 

  • Rustemeier J, Neuber M, Grießmann T, Ewaldt A, Uhl A, Schultz-von Glahn M, Betke K, Matuschek R, Lübben A (2012a). Konzeption, Erprobung, Realisierung und Überprüfung von lärmarmen Bauverfahren und Lärmminderungsmaßnahmen bei der Gründung von Offshore-WEA. Final report for the BMU funded research project “Schall III”, project ref. no. 0327645. Hanover, May 2012, 236 pp.

    Google Scholar 

  • Rustemeier J, Grießmann T, Betke K, Gabriel J, Neumann T, Küchenmeister M (2012b). Erforschung der Schallminderungsmaßnahme “Gestufter Blasenschleier” (Little Bubble Curtain) im Testfeld alpha ventus. Final report for the BMU funded research project “Schall alpha ventus”, project ref. no. 0325122 A/B. Hanover/Kaltenkirchen, July 2012, 79 pp.

    Google Scholar 

  • Steinhagen U & Mesecke-Rischmann S (2013). Untersuchung und Erprobung eines ‘Kleinen Blasenschleiers’ zur Minderung von Unterwasserschall bei Rammarbeiten für Gründungen von OWEA. Final report for the BMU funded research project “Hydroschall-OFF BO1”, project ref. no. 0325334G. Kaltenkirchen, July 2013, 48 pp.

    Google Scholar 

  • Stokes A, Cockrell K, Wilson J, Davis D, Warwick D (2010). Mitigation of Underwater Pile Driving Noise During Offshore Construction. Report no. M09PC00019 to Department of the Interior, Minerals Management Service. Groton/CT, January 2010, 104 pp.

    Google Scholar 

  • Thomsen KE (2012). Kofferdam test piling in Århus – Including the sound mitigation concept for Borwin2 and Helwin1. Århus, January 2012, 17 pp.

    Google Scholar 

  • Universal Foundation (2013). Universal Foundation Suction Bucket – A solution in support for offshore wind. Presentation Henrik Lundorf Nielsen, April 2013, http://www.windpower.org/download/1922/14_Universal_Foundation_Suction_Bucket_Henrik_Lundorf.pdf

    Google Scholar 

  • van Vessem H, van Erkel T, Jung B (2013). IHC Hydrohammer Noise Mitigation Screen: history, improvements, back-up systems, research for XL-piles and new awarded projects. Presentation at the StUKplus conference. Berlin, 31st October 2013.

    Google Scholar 

  • Wilke F, Kloske K, Bellmann M (2012). Evaluation of Systems for Ramming Noise Mitigation at an Offshore Test Pile. Final report for the BMU funded research project “ESRa”, project ref. no. 0325307. Hamburg, May 2012, 168 pp.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer Fachmedien Wiesbaden

About this chapter

Cite this chapter

Verfuß, T. (2014). Noise mitigation systems and low-noise installation technologies. In: Federal Maritime and Hydrographic Agency, ., Federal Ministry for the Environment, Nature Conservation and Nuclear Safety, . (eds) Ecological Research at the Offshore Windfarm alpha ventus. Springer Spektrum, Wiesbaden. https://doi.org/10.1007/978-3-658-02462-8_16

Download citation

Publish with us

Policies and ethics