Advertisement

A New Conceptual Framework for Hierarchically Integrated PPS-Systems

  • Christoph Schneeweiss

Abstract

Traditional Production Planning and Scheduling (PPS)-Systems have usually been designed to treat rather involved situations like that of a job shop production of the make-to-stock or make-to-order type (e.g. VOLLMANN et al.). Generally, these systems consist of the Master Production Schedule (MPS), the Material Requirements Planning (MRP)-module, the Capacity Requirements Planning (CRP)-module, and the short term job scheduling (sequencing) module (s. Fig. 1).

Keywords

Lead Time Stochastic Dynamic Programming Throughput Time Work Order Material Requirement Planning 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. AXSÄTER, S., SCHNEEWEISS, CH., SILVER, E.A. (eds.): Multi-Stage Production Planning and Inventory Control, Berlin, Heidelberg, New York 1986Google Scholar
  2. BERTRAND, J.W., WERTMANN, J.C., WIJNGAARD, J.: et al.: Production Control — A Structural and Design Oriented Approach, Amsterdam 1990Google Scholar
  3. HÄFNER, H.: Ein Warteschlangenansatz zur integrierten Produktionsplanung, Heidelberg 1992Google Scholar
  4. HÄFNER, H.: Lot Sizing and Throughput Times in a Job Shop, in: Int. Journal of Production Economics 23(1991), pp. 111–116CrossRefGoogle Scholar
  5. HEINRICH, C., SCHNEEWEISS, CH.: Multi-Stage Lot-Sizing for General Production Systems, in: S. Axsäter, Ch. Schneeweiss, E.A. Silver (eds.): Multi-Stage Production Planning and Inventory Control, Lecture Notes, Berlin, Heidelberg, New York 1986Google Scholar
  6. KARMARKAR, U.: Lot Sizes, Lead Times and In-Process Inventories, in: Management Science (1987), pp. 409–418Google Scholar
  7. SCHNEEWEISS, CH., SCHRÖDER, H.: Planning and Scheduling the Repair Shops of the Deutsche Lufthansa AG - A Hierarchical Approach, in: Production and Operations Management (POM), 1 (1992)Google Scholar
  8. SHANTIKUMAR, J., BUZZACOTT, J.: Open Queueing Network Models of Dynamic Job Shops, in: International Journal of Production Research 3(1981), pp. 255–266CrossRefGoogle Scholar
  9. SCHNEEWEISS, CH.: Planung 2, Konzepte der Prozeß- und Modellgestaltung, Berlin, Heidelberg, New York 1992Google Scholar
  10. TIJMS, H.C.: Stochastic Modelling and Analysis: A Computational Approach, John Wiley & Sons, Chichester, New York, Brisbane 1990Google Scholar
  11. VOLLMANN, T., BERRY, W., WHYBARK, C.: Manufacturing Planning and Control Systems, Homewood, Ill. 1988Google Scholar
  12. WHITT, W.: The Queueing Network Analyzer, Bell System Tech. J. 62:2779–2815, 1983Google Scholar
  13. WHITT, W.: Performance of the Queueing Network Analyzer, Bull System Tech. J. 62:2817–2843, 1983Google Scholar
  14. ZIMMERMANN, G.: Quantifizierung der Bestimmungsfaktoren von Durchlaufzeiten und Werkstattbeständen, in: ZfB 10(1984), pp. 1016–1032Google Scholar

Copyright information

© Springer-Verlag Berlin· Heidelberg 1993

Authors and Affiliations

  • Christoph Schneeweiss
    • 1
  1. 1.Faculty of Business AdministrationUniversity of Mannheim SchlossMannheim 1Germany

Personalised recommendations