Skip to main content

A Continuous Flow Model for Three Production Units in Series with Buffers

  • Conference paper
DGOR

Part of the book series: Operations Research Proceedings 1985 ((ORP,volume 1985))

  • 110 Accesses

Summary

In this paper we study three-stage production lines with intermediate buffers. The goods flow is supposed to be continuous and machine speeds may be different. Production units may be subject to stochastic failure and repair. We calculate the average line production rate for some cases. Furthermore we prove some production lines can be reduced to simpler two-stage ones.

Zusammenfassung

In dieser Arbeit untersuchen wir Produktionslinien mit drei Maschinen getrennt durch Puffer. Die Maschinen können verschiedene Geschwindigkeiten haben und abwechselnd operationsfahig und operationsunfĂ´hig sein. Wir berechnen die erwartete Liniendurchsatz fĂ¼r verschiedene Fälle. Ausserdem zeigen wir dass einige dreistations Produktionslinien gleichwertig sind mit einfachen zweistations Linien.

Research supported by the Netherlands Organization for the Advancement of Pure Research (ZWO)

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 54.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 69.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • Dennemeijer, R. (1968), Introduction to partial differential equations and boundary value problems, McGraw-Hill, New York

    Google Scholar 

  • Koenigsberg, E. (1959), Production lines and internal storage: A review, Management Science 5, 410–433

    Article  Google Scholar 

  • Malathronas, J.P, Perkins, J.D., Smith, R.L. (1983), The availability of two unreliable machines connected by an intermediate storage tank, IIE Transactions 15, 195–201

    Article  Google Scholar 

  • Muth, E.J. (1979), The reversibility property of production lines, Management Science 25, 152–158

    Article  Google Scholar 

  • Wijngaard, J. (1979), The effect of interstage buffer storage on the output of two unreliable production units inseries, with different production rates, AIIE Transactions 11, 42–47.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 1986 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

de Koster, R., Wijngaard, J. (1986). A Continuous Flow Model for Three Production Units in Series with Buffers. In: Streitferdt, L., Hauptmann, H., Marusev, A.W., Ohse, D., Pape, U. (eds) DGOR. Operations Research Proceedings 1985, vol 1985. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-71161-9_45

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-71161-9_45

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-71162-6

  • Online ISBN: 978-3-642-71161-9

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics