The WEGA Wind Turbines — Design and Construction

  • Erich Hau
  • Jens Langenbrinck
  • Wolfgang Palz

Abstract

The description of the design and construction of the WEGA wind turbines is based mainly on the ‘As-built’ and ‘Final Design Reports’ of the manufacturers or operators of the machines. For this reason the specific reports are not indicated specifically when they are quoted but they are listed in the references.

Keywords

Fatigue Graphite Torque Foam Cage 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer-Verlag Berlin Heidelberg 1993

Authors and Affiliations

  • Erich Hau
    • 1
  • Jens Langenbrinck
    • 1
  • Wolfgang Palz
    • 2
  1. 1.Ingenieurbüro für Energietechnische Analysen und Planung GmbHETAPLANMünchenGermany
  2. 2.Directorate General XII for Science, Research and DevelopmentCommission of the European CommunitiesGermany

Personalised recommendations