Abstract
We consider a lotsizing problem in a multi-stage production setting with capacity-constrained resources and a general production structure which may change during the planning horizon. Based on an earlier presentation [1], we focus on some novel concepts of capacity planning. We also present computational results for test problems obtained with the most recent version of our planning software.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Alicke, K., Eley, M., Hanne, T., Melo, T. (2001): A heuristic approach for a multistage lotsizing problem with dynamic product structure. In: Fleischmann, B.; Lasch, R.; Derigs, U.; Domschke, W.; Rieder, U., (Eds.) Operations Research Proceedings 2000. Selected Papers of the Symposium on Operations Research (OR 2000), Dresden, September 9–12, 2000, 278–283
Clark, A., Armentano, V. (1995): A heuristic for a resource-capacitated multistage lot-sizing problem with lead times. Journal of the Operational Research Society 46, 1208–1222
Dixon, P., Silver, E. (1981): A heuristic solution procedure for the multiitem, single-level, limited capacity lot-sizing problem. Journal of Operations Management 2, 23–39
França, P., Armentano, V., Beretta, R., Clark, A. (1997): A heuristic method for lot-sizing in multi-stage systems. Computers in Operations Research 24, 861–874
Tempelmeier, H., Derstroff, M. (1996): A Lagrangean-based heuristic for dynamic multilevel, multiitem constrained lotsizing with setup times. Management Science 41, 738–757
Tempelmeier, H., Helber, S. (1994): A heuristic for dynamic multi-item multilevel capacitated lotsizing for general product structures. European Journal of Operational Research 75, 296–311
Wagner, H., Whitin, T. (1958): Dynamic version of the economic lot size model. Management Science 5, 89–96
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2002 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Alicke, K., Hanne, T., Melo, T. (2002). Strategies for Capacity Planning in a Complex Production System. In: Chamoni, P., Leisten, R., Martin, A., Minnemann, J., Stadtler, H. (eds) Operations Research Proceedings 2001. Operations Research Proceedings 2001, vol 2001. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-50282-8_15
Download citation
DOI: https://doi.org/10.1007/978-3-642-50282-8_15
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-43344-6
Online ISBN: 978-3-642-50282-8
eBook Packages: Springer Book Archive