Skip to main content

Teams of Agents for Solving the Resource-Constrained Project Scheduling Problem

  • Conference paper
Advanced Techniques for Knowledge Engineering and Innovative Applications

Part of the book series: Communications in Computer and Information Science ((CCIS,volume 246))

Abstract

In this chapter the idea of Asynchronous Team (A-Team) is extended and used to solve one of the hard combinatorial optimization problems. The Team of A-Teams (TA-Teams) architecture for solving the Resource-Constrained Project Scheduling Problem (RCPSP) is proposed and experimentally validated. The RCPSP belongs to the Non-deterministic Polynomial hard (NP-hard) problem class. To solve this problem a team of parallel cooperating A-Teams is proposed. Such terms consist of asynchronous agents, implemented using JADE based A-Team (JABAT) multiagent system. Java Agent Development Framework (JADE) is a popular framework dedicated to implement agent based systems. In the proposed TA-Teams from one to four A-Teams and four kinds of optimization agent have been implemented and used. Each optimization agent represents an optimization algorithm. The proposed optimization algorithms are based on several known metaheuristics, such as a simple local search, tabu search and path relinking as well as the crossover and special heuristics dedicated to solving the RCPSP. Computational experiment involved evaluation of the proposed approach in respect of the different parameters settings controlling the working and migration strategies used in the suggested TA-Teams approach.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Agarwal, A., Colak, S., Erenguc, S.: A Neurogenetic Approach for the Resource–Constrained Project Scheduling Problem. Computers & Operations Research 38, 44–50 (2011)

    Article  MATH  MathSciNet  Google Scholar 

  2. Barbucha, D., Czarnowski, I., Jędrzejowicz, P., Ratajczak-Ropel, E., Wierzbowska, I.: e-JABAT - An Implementation of the Web-Based A-Team. In: Nguyen, N.T., Jain, L.C. (eds.) Intelligent Agents in the Evolution of Web and Applications. SCI, vol. 167, pp. 57–86. Springer, Heidelberg (2009)

    Chapter  Google Scholar 

  3. Barbucha, D., Czarnowski, I., Jędrzejowicz, P., Ratajczak-Ropel, E., Wierzbowska, I.: Parallel Cooperating A-Teams. In: Jędrzejowicz, P., Nguyen, N.T., Hoang, K. (eds.) ICCCI 2011, Part II. LNCS, vol. 6923, pp. 322–331. Springer, Heidelberg (2011)

    Chapter  Google Scholar 

  4. Bellifemine, F., Caire, G., Poggi, A., Rimassa, G.: JADE. A White Paper, Exp. 3(3), 6–20 (2003)

    Google Scholar 

  5. Błażewicz, J., Lenstra, J., Rinnooy, A.: Scheduling subject to resource constraints: Classification and complexity. Discrete Applied Mathematics 5, 11–24 (1983)

    Article  MATH  MathSciNet  Google Scholar 

  6. Brucker, P., Drexl, A., Möhring, R., Neumann, K., Pesch, E.: Resource-Constrained Project Scheduling: Notation, Classification, Models, and Methods. European Journal of Operational Research 112, 3–41 (1999)

    Article  MATH  Google Scholar 

  7. Cohoon, J.P., Hegde, S.U., Martin, W.N., Richards, D.: Punctuated Equilibria: A Parallel Genetic Algorithm. In: Proceedings of the Second International Conference on Genetic Algorithms, pp. 148–154. Lawrence Erlbaum Associates, Hillsdale (1987)

    Google Scholar 

  8. Hartmann, S., Kölisch, R.: Experimental Investigation of Heuristics for Resource-Constrained Project Scheduling: An Update. European Journal of Operational Research 174, 23–37 (2006)

    Article  MATH  Google Scholar 

  9. Jędrzejowicz, P., Ratajczak-Ropel, E.: New Generation A-Team for Solving the Resource Constrained Project Scheduling. In: Proc. the Eleventh International Workshop on Project Management and Scheduling, Istanbul, pp. 156–159 (2008)

    Google Scholar 

  10. Jędrzejowicz, P., Ratajczak-Ropel, E.: Solving the RCPSP/max Problem by the Team of Agents. In: Håkansson, A., Nguyen, N.T., Hartung, R.L., Howlett, R.J., Jain, L.C. (eds.) KES-AMSTA 2009. LNCS, vol. 5559, pp. 734–743. Springer, Heidelberg (2009)

    Chapter  Google Scholar 

  11. Jędrzejowicz, P., Ratajczak-Ropel, E.: Team of A-Teams for Solving the Resource-Constrained Project Scheduling Problem. In: Grana, M., et al. (eds.) Advances in Knowledge-Based and Intelligent Information and Engineering Systems, pp. 1201–1210. IOS Press (2012)

    Google Scholar 

  12. Jędrzejowicz, P., Wierzbowska, I.: JADE-Based A-Team Environment. In: Alexandrov, V.N., van Albada, G.D., Sloot, P.M.A., Dongarra, J. (eds.) ICCS 2006. LNCS, vol. 3993, pp. 719–726. Springer, Heidelberg (2006)

    Chapter  Google Scholar 

  13. Jędrzejowicz, P., Wierzbowska, I.: Impact of Migration Topologies on Performance of Teams of A-Teams. In: Grana, M., et al. (eds.) Advances in Knowledge-Based and Intelligent Information and Engineering Systems, pp. 1161–1170. IOS Press (2012)

    Google Scholar 

  14. Kölisch, R.: Serial and parallel Resource-Constrained Project Scheduling Methods Revisited: Theory and Computation. European Journal of Operational Research 43, 23–40 (1996)

    Google Scholar 

  15. Talukdar, S., Baerentzen, L., Gove, A., de Souza, P.: Asynchronous Teams: Co-operation Schemes for Autonomous, Computer-Based Agents. Technical Report EDRC 18-59-96. Carnegie Mellon University, Pittsburgh (1996)

    Google Scholar 

  16. Wooldridge, M.: An Introduction to MultiAgent Systems, 2nd edn. John Wiley and Sons (2009)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Jędrzejowicz, P., Ratajczak-Ropel, E. (2013). Teams of Agents for Solving the Resource-Constrained Project Scheduling Problem. In: Tweedale, J.W., Jain, L.C. (eds) Advanced Techniques for Knowledge Engineering and Innovative Applications. Communications in Computer and Information Science, vol 246. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-42017-7_16

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-42017-7_16

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-42016-0

  • Online ISBN: 978-3-642-42017-7

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics