Demand Disruption Risks as Opportunity Costs in JIT Supply Chain Coordination

Conference paper
Part of the Lecture Notes in Electrical Engineering book series (LNEE, volume 242)

Abstract

Recently, an opportunity cost reflecting the buyer’s loss of future flexibility from a finite contract commitment has been incorporated into the solution to the buyer-supplier jointly optimal production and delivery policies in a lot-splitting, Just-In-Time (JIT) supply chain. This cost plays a logical role in the model and is required to prevent an infinite contract quantity as the solution to the optimal joint policy. Current models in this area of Supply Chain Coordination (SCC) assume that this opportunity cost is given, with little or no guidance on setting an appropriate value. Demand disruption risks are cited as a major justification for the inclusion of this commitment cost in the model. This paper provides practitioners an easy-to- understand interpretation and application of this recent conceptual addition to the joint buyer-supplier JIT model. Our work provides guidance for determining an appropriate minimum commitment cost for a common situation, where the probability of obsolescence of the contracted part is known, or can be estimated (e.g. from history or from industry norms) prior to the joint optimization of the relevant policy variables. A numerical example explores the impact of this commitment cost on the optimal decisions of both parties.

Keywords

Supply chain management Supply chains Just-in-time production 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    Banerjee A, Kim SL (1995) An integrated JIT inventory model. International Journal of Operations & Production Management 15(9):237–244Google Scholar
  2. 2.
    Banerjee A (1986) A joint economic-lot-size model for purchaser and vendor. Decision Sciences 17(3):292–292Google Scholar
  3. 3.
    Huang C (2004) An optimal policy for a single-vendor single-buyer integrated production inventory problem with process unreliability consideration. International Journal of Production Economics 91(1):91–98Google Scholar
  4. 4.
    Kelle P, Al-khateeb F, Miller PA (2003) Partnership and negotiation support by joint optimal ordering/setup policies for JIT. International Journal of Production Economics 81-82:431–441Google Scholar
  5. 5.
    Kelle P, Miller PA, Akbulut AY (2007) Coordinating ordering/shipment policy for buyer and supplier: Numerical and empirical analysis of influencing factors. International Journal of Production Economics 108(1-2):100–110Google Scholar
  6. 6.
    Kelle P, Transchel S, Minner S (2009) Buyer-supplier cooperation and negotiation support with random yield consideration. International Journal of Production Economics 118(1):152–159Google Scholar
  7. 7.
    Kim SL, Ha D (2003) A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage. International Journal of Production Economics 86(1):1–10Google Scholar
  8. 8.
    Gerard P, Cachon (2003) Supply chain coordination with contracts. In: Graves SC, de Kok AG (eds.), Supply Chain Management: Design, Coordination and Operation, volume 11 of Handbooks in Operations Research and Management Science 227–339Google Scholar
  9. 9.
    Qi X, Bard JF, Yu G (2004) Supply chain coordination with demand disruptions. Omega 32(4):301–312Google Scholar
  10. 10.
    Salameh MK, Jaber MY (2000) Economic production quantity model for items with imperfect quality. International Journal of Production Economics 64(1-3):59–64Google Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2014

Authors and Affiliations

  1. 1.Decision Sciences Department, LeBow College of BusinessDrexel UniversityPhiladelphiaUSA

Personalised recommendations