Advertisement

Operation Measurement in Deploying Phase of a Certain Chariot Based on Stopwatch Time Study

Conference paper
Part of the Lecture Notes in Electrical Engineering book series (LNEE, volume 259)

Abstract

Based on human-machine operating optimization analysis of a certain type of chariot, using stopwatch time studies, by selecting qualified staff, scientific plotting out operating unit, and calculating the number of observations, and carrying out time data acquisition and analysis in accordance with the operating procedures, and eliminating outlier data, and combining the Westinghouse appraisal coefficient to determine the time standard and so on, operation measurement quantitative scientific and accuracy of a certain type of chariot deploying phase. So as to providing a reference for the formulation of a certain type of chariot operation courses appraisal standards, its core methods also have guiding significance for the study of related comprehend.

Keywords

Stopwatch time studies Deployment phase Operation measurement 

References

  1. 1.
    Guo X, Guo D (1991) Outline of ordnance operation. Tianjing EST Translation press, TianjingGoogle Scholar
  2. 2.
    Pang Z (1999) Air defense forces man-machine-environment system engineering. Air Defense Forces Academy Press, ZhengzhouGoogle Scholar
  3. 3.
    Guo F, Li S (2003) Research on work measurement technology application. Ind Eng 05:57–60Google Scholar
  4. 4.
    Yi S, Jiang Z, Chen Y (2011) Work study and human factors engineering. Tsinghua University Press, BeijingGoogle Scholar
  5. 5.
    Wang Y (2009) Study on stopwatch method to develop standard working hours. Inner Mongolia Sci Technol Econ 05:130–131Google Scholar
  6. 6.
    Yi S, Guo F (2005) Basic industrial engineering. Machine Press, BeijingGoogle Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2014

Authors and Affiliations

  1. 1.Air Defense Forces AcademyZhengzhouChina
  2. 2.Unit 66440 of PLAShijiazhuangChina

Personalised recommendations