Advertisement

Simulation-Based Analysis of Integrated Production and Transport Logistics

  • Enzo Morosini FrazzonEmail author
  • Joarez Pintarelli
  • Thomas Makuschewitz
  • Bernd Scholz-Reiter
Conference paper
Part of the Lecture Notes in Logistics book series (LNLO)

Abstract

The purpose of this paper is to present an approach for the integration of production and transport logistics in one original equipment manufacturer (OEM) and to compare its performance with a sequential procedure. Herein, delays in fulfilling delivery due dates in both non-disturbed and disturbed (with oscillating transport time) scenarios will be analysed through a simulation model. The major findings demonstrate that the proposed integrative approach outperforms the sequential one in the absorption of perturbations that can delay the production and transport of orders in production facilities along a supply chain.

Keywords

Supply Chain Production Facility Production Schedule Transport Planning Original Equipment Manufacturer 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Notes

Acknowledgments

This research was supported by CAPES, CNPq, FINEP and DFG as part of the Brazilian-German Collaborative Research Initiative on Manufacturing Technology (BRAGECRIM). This research was also supported by a grant from Simio LLC which provided the simulation software used in the computational analysis.

References

  1. Chandra P, Fisher ML (1994) Coordination of production and distribution planning. Eur J Oper Res 72:503–517zbMATHCrossRefGoogle Scholar
  2. Cheng TCE, Gordon VS, Kovalyov MY (1996) Single machine with batch deliveries. Eur J Oper Res 94:277–283zbMATHCrossRefGoogle Scholar
  3. Chen Z-L (1996) Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs. Eur J Oper Res 93:49–60zbMATHCrossRefGoogle Scholar
  4. Chen ZL (2010) Integrated production and outbound distribution scheduling: review and extensions. Oper Res 58(1):130–148Google Scholar
  5. Chen Z-L, Vairaktarakis GL (2005) Integrated scheduling of production and distribution operations. Manage Sci 51:614–628zbMATHCrossRefGoogle Scholar
  6. Chen Z-L, Pundoor G (2006) Order assignment and scheduling in a supply chain. Oper Res 54:555–572MathSciNetzbMATHCrossRefGoogle Scholar
  7. Cheung BK-S, Choy KL, Li C-L, Shi W, Tang J (2008) Dynamic routing model and solution methods for fleet management with mobile technologies. Int J Prod Econ 113(2):694–705CrossRefGoogle Scholar
  8. Cohen MA, Lee HL (1988) Strategic analysis of integrated production-distribution systems: models and methods. Oper Res 36:212–228CrossRefGoogle Scholar
  9. De Matta R, Miller T (2004) Production and inter-facility transport scheduling for a process industry. Eur J Oper Res 158:72–88zbMATHCrossRefGoogle Scholar
  10. Fumero F, Vercellis C (1999) Synchronized development of production, inventory, and distribution schedules. Transp Sci 33:330–340zbMATHCrossRefGoogle Scholar
  11. Geismar HN, Laporte G, Lei L, Sriskandarajah C (2008) The integrated production and transport scheduling problem for a product with short Lifespan. INFORMS J Comput 20(1):21–33MathSciNetzbMATHCrossRefGoogle Scholar
  12. Haham J, Yano CA (1995) The economic lot and delivery scheduling problem: Powers of two policies. Transp Sci 29:222–241CrossRefGoogle Scholar
  13. Hall NG, Lesaoana M, Potts CN (2001) Scheduling with fixed delivery dates. Oper Res 49:134–144MathSciNetzbMATHCrossRefGoogle Scholar
  14. Hall NG, Potts CN (2003) Supply chain scheduling: Batching and delivery. Oper Res 51:566–584MathSciNetzbMATHCrossRefGoogle Scholar
  15. Huang R-H, Yang C-L (2008) Overlapping production scheduling planning with multiple objectives—an ant colony approach. Int J Prod Econ 115(1):163–170CrossRefGoogle Scholar
  16. Hwang H-S (2005) An integrated distribution routing model in multi-supply center system. Int J Prod Econ 98(2):136–142CrossRefGoogle Scholar
  17. Lee CY, Chen ZL (2001) Machine scheduling with transport considerations. J Sched 4:3–24MathSciNetzbMATHCrossRefGoogle Scholar
  18. Li C-L, Vairaktarakis G, Lee C-Y (2005) Machine scheduling with deliveries to multiple customer locations. Eur J Oper Res 164:39–51MathSciNetzbMATHCrossRefGoogle Scholar
  19. Li K, Sivakumar AI, Ganesan VK (2008) Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transport. Int J Prod Econ 115(2):482–491MathSciNetCrossRefGoogle Scholar
  20. Lin BMT, Lu CY, Shyu SJ, Tsai CY (2008) Development of new features of ant colony optimization for flowshop scheduling. Int J Prod Econ 112(2):742–755CrossRefGoogle Scholar
  21. Potts CN (1980) Analysis of a heuristic for one machine sequencing with release dates and delivery times. Oper Res 28:1436–1441MathSciNetzbMATHCrossRefGoogle Scholar
  22. Pundoor G, Chen ZL (2005) Scheduling a production-distribution system to optimize the trade-off between delivery tardiness and distribution cost. Naval Res Logistics 52:571–589MathSciNetzbMATHCrossRefGoogle Scholar
  23. Pundoor G, Chen ZL (2009) Joint cyclic production and delivery scheduling in a two-stage supply chain. Int J Prod Econ 119(1):55–74CrossRefGoogle Scholar
  24. Raa B, Aghezzaf E-H (2008) Designing distribution patterns for long-term inventory routing with constant demand rates. Int J Prod Econ 112(1):255–263CrossRefGoogle Scholar
  25. Sahin F, Robinson EP, Gao L–L (2008) Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain. Int J Prod Econ 115(2):528–541CrossRefGoogle Scholar
  26. Sawik T (2009) Coordinated supply chain scheduling. Int J Prod Econ 120(2):437–451CrossRefGoogle Scholar
  27. Scholz-Reiter B, Freitag M, de Beer C, Jagalski T (2005) Modelling dynamics of autonomous logistic processes: discrete-event versus continuous approaches. Ann CIRP 55(1):413–417CrossRefGoogle Scholar
  28. Scholz-Reiter B, Frazzon EM, Makuschewitz T (2009) Integration von Produktions- und Transportsystemen entlang globaler Supply Chains. Ind Manage 6:35–38 (in German)Google Scholar
  29. Scholz-Reiter B, Schwindt C Makuschewitz T, Frazzon EM (2010) An approach for the integration of production scheduling and inter-facility transport within global supply chains. In: Proceedings of POMS annual conference 2010, VancouverGoogle Scholar
  30. Stecke KE, Zhao X (2007) Production and transport integration for a make-to-order manufacturing company with a commit-to-delivery business mode. Manuf Serv Oper Manage 9(2):206–224CrossRefGoogle Scholar
  31. Thomas DJ, Griffin PM (1996) Coordinated supply chain management. Eur J Oper Res 94:1–15zbMATHCrossRefGoogle Scholar
  32. Valente JMS, Alves RAFS (2007) Heuristics for the early/tardy scheduling problem with release dates. Int J Prod Econ 106(1):261–274CrossRefGoogle Scholar
  33. Wang G, Cheng TCE (2000) Parallel machine scheduling with batch delivery costs. Int J Prod Econ 68:177–183CrossRefGoogle Scholar
  34. Wang X, Cheng TCE (2009a) Logistics scheduling to minimize inventory and transport costs. Int J Prod Econ 121(1):266–273CrossRefGoogle Scholar
  35. Wang X, Cheng TCE (2009b) Heuristics for parallel-machine scheduling with job class setups and delivery to multiple customers. Int J Prod Econ 119(1):199–206CrossRefGoogle Scholar
  36. Woeginger GJ (1998) A polynomial-time approximation scheme for single-machine sequencing with delivery times and sequence-independent batch set-up times. J Sched 1:79–87MathSciNetzbMATHCrossRefGoogle Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2013

Authors and Affiliations

  • Enzo Morosini Frazzon
    • 1
    Email author
  • Joarez Pintarelli
    • 1
  • Thomas Makuschewitz
    • 2
  • Bernd Scholz-Reiter
    • 2
  1. 1.Industrial and Systems EngineeringFederal University of Santa Catarina Campus UFSCFlorianópolisBrazil
  2. 2.BIBA—Bremer Institut für Produktion und Logistik GmbHUniversity of BremenBremenGermany

Personalised recommendations