Abstract
A stochastic linear production planning problem with chance-constraints is introduced in order to provide a production plan that optimizes a reverse logistics system. Such a system is composed of two channels: in the forward channel, new and remanufactured products are produced and stored into a serviceable unit, while, in the reverse channel, used products collected from market are stored into a returnable unit. The uncertainties about fluctuation of demand and amount of returnable are the reason of the stochastic nature of the problem. Since global optimal solution is not easy to be achieved, near-optimal solutions become viable alternatives to be explored. In this paper, an equivalent deterministic version of the stochastic problem is presented. This equivalent problem provides an open-loop solution that is used to provide production scenarios. An example illustrates the applicability of this methodology by creating two distinct production scenarios in order to answer the following question: “Is it possible to reduce the total production cost of a company by increasing the return rate of collecting, even knowing that the cost for remanufacturing is greater than the cost for manufacturing new products?
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Ahiska, S.S., King, R.: Inventory optimization in a one product recoverable manufacturing system. Int. J. Production Economics 124, 11–19 (2010)
Bertsekas, D.P.: Dynamic programming and optimal control, vol. 1. Athena Scientific, USA (2007)
DasGupta, A.: Fundamentals of probability: a First course, Springer Texts in Statistics. ch. 10, pp. 229–231. Springer (2010)
Dobos, I.: Optimal production-inventory strategies for HMMS-type reverse logistics system. Int. J. Production Economics 81-82, 351–360 (2003)
Fleischmann, M., Bloemhof-Ruwaard, J.M., Dekker, R., Van der Laan, E., Van Nunen Jo, A.E.E., Van Wassenhove, L.N.: Quantitative models for reverse logistics: A review. European Journal of Operational Research 103, 1–17 (1997)
Graves, S.C.: A single-item inventory model for a non-stationary demand process. Manufacturing & Service Operations Management 1(1) (1999)
Inderfurthn, K.: Impact of uncertainties on recovery behavior in a remanufacturing environment. International Journal of Physical Distribution & Logistics Management 3(5), 318–336 (2005)
Nakashima, K., Arimitsu, H., Nose, T., Kuriyama, S.: Optimal control f a remanufacturing system, Int. J. Int. J. of Production Research 42(17), 3619–3625 (2004)
Pekelman, D., Rausser, G.C.: Adaptive Control: Survey of Methods and Applications, Applied Optimal Control. TIMS Studies in the Management Science, vol. 9, pp. 89–120. North-Holland (1978)
Pereira, F.B., De Sousa, J.B.: On the receding horizon hierarchical optimal control of manufacturing systems. Journal of Intelligent Manufacturing 8, 425–433 (1997)
Roy, A., Maity, K., Kar, S., Maiti, M.: A production- inventory model with manufacturing for defective and usable items in fuzzy-environment. Computers & Industrial Engineering 59, 87–96 (2009)
Silva Filho, O.S.: An open-loop solution for a stochastic production-remanufacturing plan-ning problem In: Proceeding of 8th International Conference on Informatics in Control, Automation and Robotics, Noordwijkerhout, Holland, July 28-31, pp. 28–31 (2011)
Shi, J., Zhang, G., Sha, J.: Optimal production planning for a multi-product closed loops system with uncertain demand and return. Computers & Operations Research 38, 641–650 (2011)
Wei, C., Li, Y., Cai, X.: Robust optimal policies of production and inventory with uncertain returns and remand. International Journal of Production Economics (2010), doi:10.1016
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2013 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Filho, O.S.S. (2013). An Open-Loop Approach for a Stochastic Production Planning Problem with Remanufacturing Process. In: Ferrier, JL., Bernard, A., Gusikhin, O., Madani, K. (eds) Informatics in Control, Automation and Robotics. Lecture Notes in Electrical Engineering, vol 174. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-31353-0_15
Download citation
DOI: https://doi.org/10.1007/978-3-642-31353-0_15
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-31352-3
Online ISBN: 978-3-642-31353-0
eBook Packages: EngineeringEngineering (R0)