Skip to main content

Part of the book series: Lecture Notes in Electrical Engineering ((LNEE,volume 147))

  • 2443 Accesses

Abstract

There is a trade-off in scheduling between a punctual and reliable “system railway” with lots of running time supplements on the one hand and preferably short running times in addition to a high availability of additional train slots on the other hand. In this paper the effects of different allocations of time supplements on railway infrastructure providers, railway operating companies, goods and passengers will be shown.

At first, scenarios with different allocations of time supplement will be developed. According to each scenario, parts of the running time supplement will be shifted from each line respectively line section to the subsequent stop. Afterwards, these scenarios will be analysed in their effectiveness of achieving operational and commercial targets. Parameters for different lines will be determined by a multitool- analysis. The parameters are either extracted from the timetable construction or the simulation of the railway operation. These parameters vary due to the different allocation of the time supplement in the scenarios. Later, monetary values will be assigned to the parameters for comparing the scenarios with each other. The calculations will be made using different monetary values due to the different possibilities of evaluating the delay respectively the running time.

The profit and the loss of each scenario compared to the current status will be demonstrated separately for the above-named groups that participate in the system railway.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Richtlinie 405, Fahrwegkapazität, Deutsche Bahn Netz AG, Frankfurt am Main (1999)

    Google Scholar 

  2. Richtlinie 402, Trassenmanagement, Deutsche Bahn Netz AG, Frankfurt am Main (2004)

    Google Scholar 

  3. Richtlinie 406, Fahren und Bauen, Deutsche Bahn Netz AG, Frankfurt am Main (2000)

    Google Scholar 

  4. Rail Management Consultants, Hannover, http://www.rmcon.de/en/products/railsys-product-family.html

  5. RailSys manual, Rail Management Consultants, Hannover

    Google Scholar 

  6. Radtke, A.: EDV-Verfahren zur Modellierung des Rad-Schiene-Systems. Habilitation at the Institute of Transport, Railway Construction and Opertation, Leibniz Universität Hannover (2005)

    Google Scholar 

  7. IVE mbH - Consulting Company for Traffic and Railway Engineering Ltd., Hannover, http://www.ivembh.de/dynamis/index.en.htm

  8. Rudolph, R.: Entwicklung von Strategien zur optimierten Anordnung und Dimensionierung von Zeitzuschlägen im Eisenbahnbetrieb. Dissertation at the Institute of Transport, Railway Construction and Operation, Leibniz Universität Hannover (2004)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Th. Siefer .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2012 Springer-Verlag GmbH Berlin Heidelberg

About this paper

Cite this paper

Siefer, T., Fangrat, S. (2012). Effects of Shifting Running Time Supplements. In: Ni, YQ., Ye, XW. (eds) Proceedings of the 1st International Workshop on High-Speed and Intercity Railways. Lecture Notes in Electrical Engineering, vol 147. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-27960-7_38

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-27960-7_38

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-27959-1

  • Online ISBN: 978-3-642-27960-7

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics