Abstract
This chapter focuses on planning and scheduling activities required before design and physical development are commenced. We first discuss the basics of structuring breakdowns of project activities (WBS and CBS). Second, principles applying to deterministic scheduling process are outlined. The standard scheduling documents are presented (overall master schedule, project schedule, detailed schedules), and the primary scheduling methods are shown: activity lists, Gantt charts, and network (CPM) schedules. In the process, the chapter introduces essential concepts, such as the critical path, and various types of floats. Finally, methods for resource-based and resource-constrained scheduling are discussed.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References and Additional Resources About Planning and Scheduling
Diamant L, Tumblin CR (1990) Construction cost estimates. Wiley, New York, NY
Fisk ER (2003) Construction project administration, 7th edn. Pearson Prentice Hall, Upper Saddle River, NJ
Hinze JW (2004) Construction planning and scheduling, 2nd edn. Pearson Prentice Hall, Upper Saddle River, NJ
Kelly JE, Walker MR (1959) Critical path planning and scheduling. Mauchly Associates, Ambler, PA
Kerzner H (2001) Project management: a systems approach to planning, scheduling, and controlling. Wiley, New York, NY
Meredith J, Mantel S (2006) Project management: a managerial approach, 6th edn. Wiley, New York, NY
Moder J, Phillips CR, Davis EW (1995) Project management with CPM, PERT, and precedence diagramming, 3rd edn. Van Nostrand Reinhold, New York, NY
Associated General Contractors of America (2005) Construction estimating & bidding: theory/principles/process. AGC of America, Arlington, VA
Patrick C (2004) Construction project planning and scheduling. Pearson Prentice Hall, Upper Saddle River, NJ
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2011 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
De Marco, A. (2011). Planning and Scheduling. In: Project Management for Facility Constructions. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-17092-8_8
Download citation
DOI: https://doi.org/10.1007/978-3-642-17092-8_8
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-17091-1
Online ISBN: 978-3-642-17092-8
eBook Packages: EngineeringEngineering (R0)