Abstract
The integrated risk management of construction project must be based on the information system. The paper presented the frame of integrated risk management information system, which was composed of three subsystems: risk management subsystem, risk management database and external support subsystem. The content and the function of all the subsystems were elaborated and the relationship between information system and the external system was explained. Based on the hierarchical risk breakdown structure, the field and coding of risk database are designed. The information system could provide risk management platform for the project participants, accelerate the information flow and implement the integrated risk management.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Yuan H., Apostolakis G. (1993) Conditional Influence diagrams in risk management. Risk Analysis 13:625–636
Poh Y.P., Tah J.H.M. (2006) Integrated duration-cost influence network for modeling risk impacts on construction tasks. Construction Management and Economics 24:861–868
Dikmen I., Birgonul M.T., Han S. (2007) Using fuzzy risk assessment to rate cost overrun risk in international construction projects. International Journal of Project Management 25:494–505
Xiang P.C., Xie L.L., Wang L. (2008) Research on the integrated risk management. Construction Economic 5:37–39
Gao Y.L., Li H.N., Li P. (2007) Research on the integrated risk management pattern. Construction Economic 3:24–26
Tah J.H.M., Carr V. (2001) Knowledge-based approach to construction project risk management. Journal of Computer in Civil Engineering 26:170–177
Tah J.H.M., Carr V. (2000) A proposal for construction project risk assessment using fuzzy logic. Construction Management and Economics 18:491–500
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2011 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Gao, Yl. (2011). Research on the Integrated Risk Management Information System of Construction Project. In: Wu, D. (eds) Modeling Risk Management in Sustainable Construction. Computational Risk Management. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-15243-6_6
Download citation
DOI: https://doi.org/10.1007/978-3-642-15243-6_6
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-15242-9
Online ISBN: 978-3-642-15243-6
eBook Packages: Business and EconomicsBusiness and Management (R0)