Abstract
One the most critical aspect in project management is how to assign the project managers (PMs) to projects, especially whenever the PMs can lead more than one project. The present paper proposes a parameter (PME) to evaluate the PM in accomplishing a specific project useful for a next phase of assignment. The PME takes into account the technical skills, the leadership behavior and the relationships with project’s stakeholders. These parameters are aggregated by a Fuzzy Inference System (FIS) that well emulates the decision process of the experts by means of a rule-based inference engine. Moreover, to better define the PME, a procedure, based on the discordance concept, is proposed to compare the PM skills with those required by the project.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Bi X, Zhang AD (2006) Application of fuzzy analytical hierarchy process in selecting a project manager. Proceedings of 2006 International Conference on Management Science and Engineering (13th); 1417–1421.
Bojadziev G, Bojadziev M (1999) Fuzzy logic for business, finance and management. World Scientific Publishing Co. Pte. Ltd, Singapore.
Carlsson C, Fullér R (2002) Fuzzy reasoning in decision making and optimization. Physica-Verlag, New York.
Chen SH, Lee HT (2007) Performance evaluation model for project managers using managerial practices. Int J Proj Manag 25:543–551.
Czogala E, Leski J (2000) Fuzzy and neuro-fuzzy intelligent system. Physica-Verlag, New York.
Dweiri FT, Kablan MM (2006) Using fuzzy decision making for the evaluation of the project management internal efficiency. Decis Support Syst 42:712–726.
El-Sabaa S (2001) The skills and career path of an effective project manager. Int J Proj Manag 19:1–7.
Fasanghari M, Roudsari FH (2008) Optimized ICT project selection utilizing fuzzy system. World Appl Sci J 4(1):44–49.
Klir G, Yuan Bo (1995) Fuzzy sets and fuzzy logic-theory and applications. Prentice Hall PTR, New Jersey.
Kotter J (1990) A force change: how leadership differs from management. The Free Press, New York.
Lee C (1990) Fuzzy logic in control systems: fuzzy logic controller. Parts I II IEEE Trans Syst Man Cybern 20:404–435.
Lin L, Wei Y, Fei C (2007) Relation of the project manager leadership and performance. Shanghai: International Conference on Wireless Communications, Networking and Mobile Computing; 5244–5247.
Mamdani EH, Assilian S (1975) An experiment in linguistic synthesis with a fuzzy logic controller. Int J Man-Mach Stud 7:1–13.
Müller R, Turner JR (2007) Matching the project manager’s leadership style to project type. Int J Proj Manag 25:21–32.
Pedrycz W (1994) An why triangular membership functions?. Fuzzy Sets Syst 64(1):21–30.
Project Management Institute Inc (2004) A guide to the project management body of knowledge-PMBOK guide, 3rd edn. Project Management Institute Inc, PA/USA.
Roy B (1990) The outranking approach and the foundations of ELECTRE methods in reading in multiple criteria decision aid. In: Bana e Costa CA (ed) Reading in multiple criteria decision aid. Springer Verlag, Berlin, 155–183.
Sugeno M (1985) An introductory survey of fuzzy control. Inf Sci 36:59–83.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2010 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Certa, A., Enea, M., Galante, G., La Fata, M. (2010). A Project Manager Suitability Parameter in Project Accomplishment. In: Taticchi, P. (eds) Business Performance Measurement and Management. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-04800-5_12
Download citation
DOI: https://doi.org/10.1007/978-3-642-04800-5_12
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-04799-2
Online ISBN: 978-3-642-04800-5
eBook Packages: Business and EconomicsBusiness and Management (R0)