Skip to main content

A Project Manager Suitability Parameter in Project Accomplishment

  • Chapter
  • First Online:
Business Performance Measurement and Management
  • 4495 Accesses

Abstract

One the most critical aspect in project management is how to assign the project managers (PMs) to projects, especially whenever the PMs can lead more than one project. The present paper proposes a parameter (PME) to evaluate the PM in accomplishing a specific project useful for a next phase of assignment. The PME takes into account the technical skills, the leadership behavior and the relationships with project’s stakeholders. These parameters are aggregated by a Fuzzy Inference System (FIS) that well emulates the decision process of the experts by means of a rule-based inference engine. Moreover, to better define the PME, a procedure, based on the discordance concept, is proposed to compare the PM skills with those required by the project.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  • Bi X, Zhang AD (2006) Application of fuzzy analytical hierarchy process in selecting a project manager. Proceedings of 2006 International Conference on Management Science and Engineering (13th); 1417–1421.

    Google Scholar 

  • Bojadziev G, Bojadziev M (1999) Fuzzy logic for business, finance and management. World Scientific Publishing Co. Pte. Ltd, Singapore.

    Google Scholar 

  • Carlsson C, Fullér R (2002) Fuzzy reasoning in decision making and optimization. Physica-Verlag, New York.

    Google Scholar 

  • Chen SH, Lee HT (2007) Performance evaluation model for project managers using managerial practices. Int J Proj Manag 25:543–551.

    Article  Google Scholar 

  • Czogala E, Leski J (2000) Fuzzy and neuro-fuzzy intelligent system. Physica-Verlag, New York.

    Google Scholar 

  • Dweiri FT, Kablan MM (2006) Using fuzzy decision making for the evaluation of the project management internal efficiency. Decis Support Syst 42:712–726.

    Article  Google Scholar 

  • El-Sabaa S (2001) The skills and career path of an effective project manager. Int J Proj Manag 19:1–7.

    Article  Google Scholar 

  • Fasanghari M, Roudsari FH (2008) Optimized ICT project selection utilizing fuzzy system. World Appl Sci J 4(1):44–49.

    Google Scholar 

  • Klir G, Yuan Bo (1995) Fuzzy sets and fuzzy logic-theory and applications. Prentice Hall PTR, New Jersey.

    Google Scholar 

  • Kotter J (1990) A force change: how leadership differs from management. The Free Press, New York.

    Google Scholar 

  • Lee C (1990) Fuzzy logic in control systems: fuzzy logic controller. Parts I II IEEE Trans Syst Man Cybern 20:404–435.

    Article  Google Scholar 

  • Lin L, Wei Y, Fei C (2007) Relation of the project manager leadership and performance. Shanghai: International Conference on Wireless Communications, Networking and Mobile Computing; 5244–5247.

    Google Scholar 

  • Mamdani EH, Assilian S (1975) An experiment in linguistic synthesis with a fuzzy logic controller. Int J Man-Mach Stud 7:1–13.

    Article  Google Scholar 

  • Müller R, Turner JR (2007) Matching the project manager’s leadership style to project type. Int J Proj Manag 25:21–32.

    Article  Google Scholar 

  • Pedrycz W (1994) An why triangular membership functions?. Fuzzy Sets Syst 64(1):21–30.

    Article  Google Scholar 

  • Project Management Institute Inc (2004) A guide to the project management body of knowledge-PMBOK guide, 3rd edn. Project Management Institute Inc, PA/USA.

    Google Scholar 

  • Roy B (1990) The outranking approach and the foundations of ELECTRE methods in reading in multiple criteria decision aid. In: Bana e Costa CA (ed) Reading in multiple criteria decision aid. Springer Verlag, Berlin, 155–183.

    Google Scholar 

  • Sugeno M (1985) An introductory survey of fuzzy control. Inf Sci 36:59–83.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Antonella Certa .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2010 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Certa, A., Enea, M., Galante, G., La Fata, M. (2010). A Project Manager Suitability Parameter in Project Accomplishment. In: Taticchi, P. (eds) Business Performance Measurement and Management. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-04800-5_12

Download citation

Publish with us

Policies and ethics